NORWAY · WELLBORES · NPDID 10407

25/2-D-14

Development · Observation · Plugged · Aker BP ASA · Hugin · PL 442

25/2-D-14 is an observation development wellbore in the North Sea, drilled by Aker BP ASA, entered Oct 10, 2025.

Discovery 25/2-17 · On the map →

—
m total depth
119.3
m water depth
Oct 10, 2025
entered · completed Jun 10, 2026
—
at total depth
—
m of core
—
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED SEP 2, 2026 · RELEASED JUN 10, 2028

On file for this wellbore

Nothing yet. The Directorate has no tops, samples, logs, or documents on file for this wellbore; material from a new well is released two years after completion.

Drilling

Drilling facility
NOBLE INTEGRATOR · Jack-up 3 legs
Drilling days
244
Kelly bushing elevation
58.6 m
Maximum inclination
—°
Drilling permit
5854-P
Licensing round
2-A
Plugged and abandoned
Jun 10, 2026
Core samples available
No
Cuttings samples available
No
Position · ED50
59.87157° N, 2.56763° E

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/10407, documented in the API reference.