NORWAY · WELLBORES · NPDID 10545
34/8-A-37 H
Exploration · Wildcat · Plugged · Shows · Equinor Energy AS · PL 120
34/8-A-37 H is a wildcat exploration wellbore in the North Sea, drilled by Equinor Energy AS, entered Jan 17, 2026, to 6,691 m.
- 6,691
- m total depth
- 335
- m water depth
- Jan 17, 2026
- entered · completed Apr 15, 2026
- —
- at total depth · Late Triassic
- —
- m of core
- —
- °C bottom-hole temperature
SODIR FACTPAGES · RECORD UPDATED MAY 21, 2026 · RELEASED APR 15, 2028
On file for this wellbore
Nothing yet. The Directorate has no tops, samples, logs, or documents on file for this wellbore; material from a new well is released two years after completion.
Drilling
- Drilling facility
- VISUND · Semisub steel
- Drilling days
- 89
- Kelly bushing elevation
- 29 m
- Maximum inclination
- —°
- Drilling permit
- 2069-L
- Licensing round
- 10-A
- Plugged and abandoned
- Apr 15, 2026
- Core samples available
- No
- Cuttings samples available
- No
- Position · ED50
- 61.37022° N, 2.45993° E
Around this wellbore
This wellbore on Sodir FactPages → · Press release →
About this data
Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.
Developers: this page as JSON is GET /v1/data/norway/wells/10545, documented in the API reference.