NORWAY · WELLBORES · NPDID 10546

16/4-BF-2 Y2H

Development · Production · Closed · Aker BP ASA · Solveig · PL 359

16/4-BF-2 Y2H is a production development wellbore in the North Sea, drilled by Aker BP ASA, entered Mar 2, 2026, to 5,922 m.

Discovery 16/4-6 S Solveig · On the map →

5,922
m total depth
100.2
m water depth
Mar 2, 2026
entered · completed Apr 3, 2026
—
at total depth
—
m of core
—
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED SEP 2, 2026 · RELEASED APR 3, 2028

On file for this wellbore

Nothing yet. The Directorate has no tops, samples, logs, or documents on file for this wellbore; material from a new well is released two years after completion.

Drilling

Drilling facility
DEEPSEA NORDKAPP · Semisub steel
Drilling days
33
Kelly bushing elevation
32.7 m
Maximum inclination
—°
Drilling permit
5903-P2
Licensing round
TFO2005
Plugged and abandoned
—
Core samples available
No
Cuttings samples available
No
Position · ED50
58.67266° N, 2.23667° E

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/10546, documented in the API reference.