NORWAY · WELLBORES · NPDID 107

7120/9-2

Exploration · Appraisal · P&A · Gas · Norsk Hydro Produksjon AS · Snøhvit · PL 078

6 documents: reports, logs, and plots →

7120/9-2 is an appraisal exploration wellbore in the Barents Sea, drilled by Norsk Hydro Produksjon AS, entered Apr 18, 1984, to 5,072 m in the Røye Fm.

Discovery 7120/9-1 (Albatross) · On the map →

5,072
m total depth · 5,069 m vertical
293
m water depth
Apr 18, 1984
entered · completed Oct 20, 1984
Røye Fm
at total depth · Late Permian
—
m of core
161
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED NOV 4, 2026 · RELEASED OCT 20, 1986

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
TREASURE SCOUT · Semisub steel
Drilling days
186
Kelly bushing elevation
23 m
Maximum inclination
6.69999981°
Drilling permit
410-L
Licensing round
5
Plugged and abandoned
—
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
71.49467° N, 20.70149° E
Hydrocarbons in
Kapp Toscana Gp · Jurassic
Hydrocarbons in
Fruholmen Fm · Late Triassic

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

Wildcat well 7120/9-2 is located in The Hammerfest Basin, west of the Albatross discovery, later included in the Snøhvit Discovery. The structure comprised a dome like feature transected by a few major N-S, and E-W oriented faults. The 7120/9-2 well was drilled in a crestal position on this structure and planned total depth was 5500 m in rocks of Permian/Carboniferous age. The objective of well 7120/9-2 was to test Permian reservoirs confined by Permian Marker III (4810 m ±150 m), Permian Marker II (4745 m ±50 m), and Permian Marker I (4620 m ±150 m) for hydrocarbons.

Operations and results

Well 7120/9-2 was spudded with the semi-submersible rig Treasure Scout on18 April 1984 and drilled to a total depth of 5072 m in limestones, siltstones and cherts the Permian Røye Formation. The well was drilled with Bentonite and seawater to 381 m, with KCl/Polymer mud from 381 m to 1165 m, with Lignosulfonate /Polymer mud from 3900 m to 4270 m, and with Gel/Lignosulfonate mud from 4270 m to TD. A 17 1/2" pilot hole was drilled to 1165 m, before underreaming to 26" hole. The underreamer was lost in the hole and the well was sidetracked at 1070 m. While running the 20" casing, it parted but was recovered. Before drilling the 12 1/4" hole section two cement squeeze jobs were performed due to a low leak off test. Due to lost circulation the 9 5/8" casing was set at 4270 m. Before drilling the 8 3/8" hole section a cement squeeze job was performed due to a low leak off test. Due to lost circulation the 7" liner was set at 4791 m. Two cement squeeze jobs were performed. At 5072 m lost circulation problems occurred, the well was logged and plugged back and terminated earlier than prognosed.

Some of the Jurassic sandstone intervals encountered between 1970 m and 2290 m were gas bearing, with structural closure at the point where the well bore penetrated the formation. The intervals were subdivided into thr

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/107, documented in the API reference.