NORWAY · WELLBORES · NPDID 1078

6507/7-9

Exploration · Appraisal · P&A · Dry · Conoco Norway Inc. · Heidrun · PL 095

3 documents: reports, logs, and plots →

6507/7-9 is an appraisal exploration wellbore in the Norwegian Sea, drilled by Conoco Norway Inc., entered Aug 4, 1987, to 850 m in the Naust Fm.

Discovery 6507/7-2 Heidrun · On the map →

850
m total depth · 850 m vertical
345
m water depth
Aug 4, 1987
entered · completed Aug 8, 1987
Naust Fm
at total depth · Pliocene
—
m of core
—
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED NOV 4, 2026 · RELEASED AUG 8, 1989

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
TREASURE HUNTER · Semisub steel
Drilling days
5
Kelly bushing elevation
25 m
Maximum inclination
2.0999999°
Drilling permit
555-L
Licensing round
8
Plugged and abandoned
—
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
65.32543° N, 7.31776° E

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

Well 6507/7-9 was drilled in the Northern part of the Haltenbanken area, near the crest of the Heidrun Field structure, at the proposed site for the production platform. The well was a pilot hole for the Heidrun Field production wells. It should evaluate the top 150 m of sediments below seabed as foundation for the Heidrun Production Platform, and it should drill to 850 m RKB to ensure that the section to be penetrated by the conductors and surface pipes for all production wells, is free of shallow gas. A site survey had detected five shallow gas anomalies at 505, 558, 609, 708, and 762 m.

Operations and results

Appraisal well 6507/7-9 was spudded with the semi-submersible installation Treasure Hunter on 4 August 1987 and drilled to TD at 850 m in Pliocene sediments of the Naust Formation. No significant problems were encountered during drilling. The well was drilled all through with seawater and pre-hydrated bentonite and returns to the seabed. A sub-sea camera was monitoring the wellhead area.

Boulders were encountered between 380 m and 400 m, but created no torquing problems while drilling. Wire line logs identified sands at 600 to 612 m, at 695 to 698 m, and at 749 to 757 m. Gas bubbles were observed emanating from the wellhead while drilling the sand at 600 - 612 m. The gas bubbles decreased after drilling the section and ceased while circulating seawater around to the seabed, indicating hydrostatic pressure. The other sands produced no gas bubbles to surface, and none of the sands showed any signs of high resistivity. It was concluded that shallow gas should not be a problem in drilling future wells from the Heidrun Platform on this location, although shallow gas-filled sands in neighbouring locations could not be excluded.

No cores were cut and no wire line fluid samples taken in this well.

The well was permanently abandoned on 8 August 1987 as a dry well

Testing

No

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/1078, documented in the API reference.