NORWAY · WELLBORES · NPDID 1138
7219/9-1
Exploration · Wildcat · P&A · Shows · Norsk Hydro Produksjon AS · PL 136
7219/9-1 is a wildcat exploration wellbore in the Barents Sea, drilled by Norsk Hydro Produksjon AS, entered Nov 17, 1987, to 4,300 m in the Snadd Fm.
- 4,300
- m total depth · 4,286 m vertical
- 356
- m water depth
- Nov 17, 1987
- entered · completed Feb 25, 1988
- Snadd Fm
- at total depth · Late Triassic
- 216.3
- m of core in 10 cores
- 145
- °C bottom-hole temperature
SODIR FACTPAGES · RECORD UPDATED MAR 1, 2026 · RELEASED FEB 25, 1990
On file for this wellbore
What the Directorate holds from this wellbore. Each opens the section that lists it.
Drilling
- Drilling facility
- POLAR PIONEER · Semisub steel
- Drilling days
- 101
- Kelly bushing elevation
- 23 m
- Maximum inclination
- 8.19999981°
- Drilling permit
- 568-L
- Licensing round
- 11-A
- Plugged and abandoned
- —
- Core samples available
- Yes
- Cuttings samples available
- No
- Position · ED50
- 72.40022° N, 19.95324° E
Well history
WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE
General
Well 7219/9-1 is located in the Bjørnøya Sør area between the Veslemøy High and the Polheim Sub-platform. The main target in the well was the reservoir and hydrocarbon potential of Early-Middle Jurassic sandstones. Late Triassic sandstone of the Snadd Formation was a secondary target. The wildcat well should also provide good seismic tie and gain velocity information to enable more detailed mapping of the area. It should further provide maximum amounts of information on source, seal and reservoir intervals. The well was positioned to leave a minimum of untested reserves up-dip with respect to the primary objective.
Operations and results
Wildcat well 7219/9-1 was spudded with the semi-submersible installation Polar Pioneer on 17 November 1987 and drilled to TD at 4300 m in the Triassic Snadd Formation. The hole was drilled without riser to the 20" casing depth. It was drilled to 1625 m without problems when loss of drilling mud occurred. The hole was stabilised, logged, sidewall cores were cut, and it was cemented. During cementing there were problems in the top hole with the BOP and permanent guide base. Upper part of the 30" section was cemented. Coring equipment did not get past dog leg at 2208 m. Attempts to open the hole were made but the equipment got stuck. Fishing was unsuccessful. A cement plug was set from 2185 m to 2004 m, and the hole was sidetracked at ca 2078 m. Further drilling to TD went without significant problems. The well was drilled with seawater and hi-vis pills down to 718 m and with KCl / polymer mud from 718 m to 2723 m. From 2723 m the KCl was allowed to deplete naturally and the well was drilled with a polymer mud to TD.
Top reservoir, Stø Formation, was encountered from 1950.5 m to 2062 m with 99 m net sand of 17.8% average porosity. Nordmela Formation was penetrated from 2062 m to 2205.5 m with 59.5 m net sand with 16.5 % average porosity. The Tubåen Formation from 2205.5 m to 2305 m
Around this wellbore
This wellbore on Sodir FactPages →
About this data
Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.
Developers: this page as JSON is GET /v1/data/norway/wells/1138, documented in the API reference.