NORWAY · WELLBORES · NPDID 116
2/7-14
Exploration · Appraisal · Suspended · Oil · Phillips Petroleum Company Norway · Ekofisk · PL 018
2/7-14 is an appraisal exploration wellbore in the North Sea, drilled by Phillips Petroleum Company Norway, entered Aug 9, 1979, to 3,390 m in the Tor Fm.
Discovery 2/4-2 Ekofisk · On the map →
- 3,390
- m total depth
- 71
- m water depth
- Aug 9, 1979
- entered · completed Jan 20, 1980
- Tor Fm
- at total depth · Late Cretaceous
- 113.6
- ft of core in 13 cores
- 124
- °C bottom-hole temperature
SODIR FACTPAGES · RECORD UPDATED FEB 20, 2026 · RELEASED JAN 20, 1982
On file for this wellbore
What the Directorate holds from this wellbore. Each opens the section that lists it.
Drilling
- Drilling facility
- HAAKON MAGNUS · Semisub steel
- Drilling days
- 165
- Kelly bushing elevation
- 25 m
- Maximum inclination
- 0°
- Drilling permit
- 221-L
- Licensing round
- 1-A
- Plugged and abandoned
- —
- Core samples available
- Yes
- Cuttings samples available
- Yes
- Position · ED50
- 56.48897° N, 3.23407° E
- Hydrocarbons in
- Ekofisk Fm · Paleocene
- Hydrocarbons in
- Tor Fm · Late Cretaceous
Well history
WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE
General
Well 2/7-14 was drilled to delineate the southern limits of the Ekofisk Field in the southern Norwegian North Sea. The primary target was the Danian limestone. It was anticipated that the proposed location would have a similar structural position as development well 2/4-A-3 and a comparable amount of Danian net pay. The secondary target was the Late Cretaceous limestone, which was untested on the southern nose of the Ekofisk Field.
Operations and results
Appraisal well 2/7-14 was spudded with the semi-submersible installation Haakon Magnus on 9 August 1979 and drilled to TD at 3390 m in Late Cretaceous limestone. The well was drilled with Bentonite/Flosal spud mud to 20" casing point at 609 m, with Seawater/Native solids mud from 609 m to 13 3/8" casing point at 1526 m, with Drispac/ Lignosulphonate dispersed, inhibitive mud from 1526 m to 9 5/8" casing point at 3068 m, and with Bentonite/ Lignite/Drispac low fluid loss mud from 3068 m to TD.
Top Paleocene was encountered at 3045 m. Top of the Danian Limestone was penetrated at 3146 m, 15 m low to prognosis, with 52 m of Danian net pay, compared to 86 m Danian net pay in well 2/4-A-3. The Danian reservoir pressures were found to be less than virgin Ekofisk pressures, evidence that the interval had been drained by the nearby well 2/4-A-3. The Late Cretaceous was encountered at 3257 m, 13 m low to prognosis. The section flowed oil with a large volume of associated water in DST 2.
A total of 119 m core was recovered in 13 cores from the Paleocene and Late Cretaceous in the interval 3123 - 3306 m. No fluid sample was taken on wire line.
The well was suspended on 20 January 1980 as an oil appraisal.
Testing
Five drill stem tests were made through perforations in the 7" liner.
DST 1 at 3346.7 - 3349.8 m in the Late Cretaceous Limestone recovered 12 m3 water cushion plus 21 m3 formation fluid (85% water,
Around this wellbore
This wellbore on Sodir FactPages →
About this data
Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.
Developers: this page as JSON is GET /v1/data/norway/wells/116, documented in the API reference.