NORWAY · WELLBORES · NPDID 1263

2/1-A-4

Development · Production · P&A · Oil · BP Norway Limited U.A. · Gyda · PL 019 B

2/1-A-4 is a production development wellbore in the North Sea, drilled by BP Norway Limited U.A., entered May 5, 1988, to 4,550 m.

Discovery 2/1-3 Gyda · On the map →

4,550
m total depth · 3,973 m vertical
66
m water depth
May 5, 1988
entered · completed Jun 17, 1988
—
at total depth
116.1
m of core in 6 cores
—
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED SEP 2, 2026 · RELEASED JUN 17, 1990

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
VILDKAT EXPLORER · Semisub steel
Drilling days
44
Kelly bushing elevation
25 m
Maximum inclination
—°
Drilling permit
453-P
Licensing round
1-A
Plugged and abandoned
Sep 19, 2021
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
56.90492° N, 3.08520° E

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/1263, documented in the API reference.