NORWAY · WELLBORES · NPDID 1343

2/4-14

Exploration · Wildcat · Suspended · Oil/gas · Saga Petroleum ASA · PL 146

4 documents: reports, logs, and plots →

2/4-14 is a wildcat exploration wellbore in the North Sea, drilled by Saga Petroleum ASA, entered Oct 6, 1988, to 4,734 m in the Mandal Fm.

Discovery 2/4-14 · On the map →

4,734
m total depth · 4,733 m vertical
68
m water depth
Oct 6, 1988
entered · completed Jan 31, 1989
Mandal Fm
at total depth · Early Cretaceous
—
m of core
150
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED FEB 20, 2026 · RELEASED JAN 31, 1991

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
TREASURE SAGA · Semisub steel
Drilling days
118
Kelly bushing elevation
26 m
Maximum inclination
2.20000005°
Drilling permit
593-L
Licensing round
12
Plugged and abandoned
—
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
56.68479° N, 3.14530° E
Hydrocarbons in
Mandal Fm · Early Cretaceous

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

Well 2/4-14 was designed to drill the same structure on the Steinbit Terrace as well 2/4-13, which was junked on 6 October 1988 due to technical problems. The wells were drilled in the middle of a structural/stratigraphic closure on a rotated fault block. Their primary objectives were to assess the hydrocarbon potential of the main structure in block 2/4. The target was expected Late Jurassic sandstone.

Operations and results

Wildcat well 2/4-14 was spudded with the semi-submersible installation Treasure Saga on 6 October 1988, 53.4 m NNW of the 2/4-13 location. It was drilled to TD at 4734 m in the Late Jurassic Tyne Group. The well was drilled with spud mud and gel down to 916 m, with KCl mud from 916 m to 4453 m, and with Hi Temp Polymer mud from 4453 m to TD.

Drilling went without significant problems down to 3687 m in the 12 1/4" section. On trip out of hole the drill string got stuck with the bit at 3538 m. The pipe could not be freed and a cement plug was set from 3475 m to 3395 m. A technical sidetrack was kicked off from 3415 m to 3463 m. Due to high temperatures the MWD worked only in part, but drilling of the remaining part of the 12 1/4" section to 4453 m proceeded without significant problems. The 8 1/2" hole was drilled to 4713 m where gas cut mud were observed with a maximum gas reading of 68 %. The hole was drilled to 4714 m when the mud weight was increased to 2.10 SG. This mud weight was near the fracture gradient at the casing seat. The equivalent circulating density at the drilling pump rates exceeded the fracture gradient at the casing seat. At 4734 m the well kicked, and gained a total 6.5 m3. The well was shut in and several attempts were made to gain control, without success. Coil tubing was run in to 4691 m and drill pipe circulated to seawater. A 1/2 bbl was taken and the well closed in. Finally, as the drill pipe started to come out of the hole, the shear-rams were activated and the

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/1343, documented in the API reference.