NORWAY · WELLBORES · NPDID 1376

2/4-A-4 A

Development · Production · P&A · Oil · Phillips Petroleum Company Norway · Ekofisk · PL 018

2/4-A-4 A is a production development wellbore in the North Sea, drilled by Phillips Petroleum Company Norway, entered Feb 17, 1989, to 3,827 m.

Discovery 2/4-2 Ekofisk · On the map →

3,827
m total depth · 3,335 m vertical
70
m water depth
Feb 17, 1989
entered · completed Mar 19, 1989
—
at total depth
19.3
ft of core in 7 cores
—
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED SEP 2, 2026 · RELEASED MAR 19, 1991

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
EKOFISK A · Jacket 8 legs
Drilling days
31
Kelly bushing elevation
33 m
Maximum inclination
—°
Drilling permit
502-P
Licensing round
1-A
Plugged and abandoned
Dec 15, 2016
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
56.52083° N, 3.22294° E

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/1376, documented in the API reference.