NORWAY · WELLBORES · NPDID 1383

2/8-13

Exploration · Wildcat · P&A · Shows · Amoco Norway Oil Company · PL 006

4 documents: reports, logs, and plots →

2/8-13 is a wildcat exploration wellbore in the North Sea, drilled by Amoco Norway Oil Company, entered Apr 29, 1989, to 1,940 m in the Zechstein Gp.

On the map →

1,940
m total depth · 1,939 m vertical
68.7
m water depth
Apr 29, 1989
entered · completed Jun 22, 1989
Zechstein Gp
at total depth · Late Permian
2
m of core in 1 core
96
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED MAR 1, 2026 · RELEASED JUN 22, 1991

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
DYVI STENA · Semisub steel
Drilling days
55
Kelly bushing elevation
25 m
Maximum inclination
5.4000001°
Drilling permit
607-L
Licensing round
1-A
Plugged and abandoned
—
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
56.38935° N, 3.39933° E

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

Exploration well 2/8-13 was designed to test the Tertiary and Upper Cretaceous chalks overlying a salt induced domal feature, unofficially named Mode, in the western part of block 2/8. The objectives were to test the possible hydrocarbon accumulation contained within the Tertiary and Upper Cretaceous chalks of the Ekofisk, Tor and Hod Formations; to determine the reservoir quality of the Shetland Group over the structure; to determine the chalk stratigraphy over the Mode salt dome; and to acquire a VSP to help to image the chalk distribution and thickness over the Mode feature.

The well was planned to penetrate the Shetland Group on a structurally high at the northern flank of the Mode salt feature. Shallow gas was expected at 507- 590- and 730 m.

Operations

Wildcat well 2/8-13 was spudded with the semi-submersible installation Dyvi Stena on 28 April 1989 and drilled to TD at 1940 m in the Permian Zechstein Group. The well was drilled with seawater / gel / polymer down to 380 m, with PHPA/PAC mud from 380 m to 1253 m, with PHPA/PAC/ANCOMEL mud from 1253 m to 1457 m, with PHPA/PAC/NaCl mud from 1457 to 1758 m, and with NaCl/PAC mud from 1758 m to TD. Shallow gas was encountered at the prognosed depths, and controlled with heavy mud. Shallow gas encountered in sands at 828 m, caused the well to flow. The flow was killed with heavy mud, and caused no injuries or damages. The drill pipe got stuck, and had to be shot of above the BHA, which than was cemented in. The well was kicked off for the 2/8-13 sidetrack at 412 m.

The Paleocene section was thinner than expected, with Balder Sele and part of the Lista Formations missing. The gas cloud above the structure caused some difficulties as to predicting formation depths and velocity correlations across the structure. The well drilled directly from Upper Cretaceous to Permian rocks. The Shetland Group came in 220 m higher than prognosed and was 9.5 m thick, compared to p

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/1383, documented in the API reference.