NORWAY · WELLBORES · NPDID 1385

2/1-A-1

Development · Production · P&A · Oil · BP Norway Limited U.A. · Gyda · PL 019 B

2/1-A-1 is a production development wellbore in the North Sea, drilled by BP Norway Limited U.A., entered May 26, 1989, to 4,900 m.

Discovery 2/1-3 Gyda · On the map →

4,900
m total depth · 4,269 m vertical
66
m water depth
May 26, 1989
entered · completed Jul 19, 1989
—
at total depth
64.6
m of core in 9 cores
—
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED SEP 2, 2026 · RELEASED JUL 19, 1991

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
VILDKAT EXPLORER · Semisub steel
Drilling days
55
Kelly bushing elevation
25 m
Maximum inclination
—°
Drilling permit
512-P
Licensing round
1-A
Plugged and abandoned
Sep 13, 2021
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
56.90487° N, 3.08529° E

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/1385, documented in the API reference.