35/9-1 R is a wildcat exploration wellbore in the North Sea, drilled by Norsk Hydro Produksjon AS, entered Jul 3, 1989, to 2,350 m in the Basement.

Discovery 35/9-1 Gjøa · On the map →

2,350
m total depth · 2,348 m vertical
361
m water depth
Jul 3, 1989
entered · completed Jul 27, 1989
Basement
at total depth · Pre-Devonian
—
m of core
82
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED NOV 4, 2026 · RELEASED JUL 27, 1991

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
POLAR PIONEER · Semisub steel
Drilling days
25
Kelly bushing elevation
23 m
Maximum inclination
5.5°
Drilling permit
603-L2
Licensing round
12
Plugged and abandoned
Jul 27, 1989
Core samples available
No
Cuttings samples available
No
Position · ED50
61.38554° N, 3.98437° E
Hydrocarbons in
Viking Gp · Late Jurassic
Hydrocarbons in
Brent Gp · Middle Jurassic
Hydrocarbons in
Dunlin Gp · Early Jurassic

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

Well 35/9-1 R is a re-entry of well 35/9-1, which found oil and gas in the Jurassic. Well 35/9-1 was suspended without testing due to other assignment for the rig. The objective for 35/9-1 R was testing and permanent abandonment.

Operations and results

Appraisal well 35/9-1 was re-entered (35/9-1 R) with the semi-submersible installation Polar Pioneer on 3 July 1989

The well was tested, plugged, and permanently abandoned as an oil and gas appraisal.

Testing

Three DSTs were performed. Production test data quoted below refer to maximum rates at the specified choke sizes.

DST 1 was performed in the interval 2285.8-2291.8 m (Dunlin Group). It flowed at an oil rate of 903 Sm3/day through a 25.4 mm choke. The GOR was 284 Sm3/Sm3. The oil gravity was 0.815 g/cc and the gas gravity 0.705 (air = l). The wellhead pressure was 73.5 bars and the bottom hole temperature 79.9 deg C. The well produced no CO2 or H2S. The production index was 23.6 Sm3/day/bar.

DST 2 was performed in the interval 2225.4-2249.4 m (Brent Group). It flowed at a gas rate of 598000 Sm3/day through a 17.46 mm choke. The GOR was 3014 Sm3/Sm3. The oil gravity was 0.728 g/cc and the gas gravity 0.681 (air=l). The wellhead pressure was 150.6 bar and the bottom hole temperature 78.2 deg C. The well produced 0.4% CO2 and no H2S.

DST 3 was performed in the interval 2100.3 - 2138.3 m (Krossfjord Formation). It flowed at a gas rate of 912500 Sm3/day through a 25.4 mm choke. The GOR was 5098 Sm3/Sm3. The oil gravity was 0.749 g/cc and the gas gravity 0.705 (air=l). The wellhead pressure was 116.5 bars and the bottom hole temperature 74.2 deg C. The well produced 0.4% CO2 and no H2S.

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/1441, documented in the API reference.