NORWAY · WELLBORES · NPDID 1453
31/2-16 S
Exploration · Appraisal · P&A · Oil/gas · Norsk Hydro Produksjon AS · Troll · PL 054
31/2-16 S is an appraisal exploration wellbore in the North Sea, drilled by Norsk Hydro Produksjon AS, entered Sep 27, 1989, to 2,390 m in the Sognefjord Fm.
Discovery 31/2-1 (Troll Vest) · On the map →
- 2,390
- m total depth · 1,587 m vertical
- 331
- m water depth
- Sep 27, 1989
- entered · completed Dec 27, 1989
- Sognefjord Fm
- at total depth · Late Jurassic
- —
- m of core
- 40
- °C bottom-hole temperature
SODIR FACTPAGES · RECORD UPDATED NOV 4, 2026 · RELEASED DEC 27, 1991
On file for this wellbore
What the Directorate holds from this wellbore. Each opens the section that lists it.
Drilling
- Drilling facility
- DEEPSEA BERGEN decom · Semisub steel
- Drilling days
- 92
- Kelly bushing elevation
- 23 m
- Maximum inclination
- 92.80000305°
- Drilling permit
- 622-L
- Licensing round
- 4
- Plugged and abandoned
- —
- Core samples available
- Yes
- Cuttings samples available
- Yes
- Position · ED50
- 60.76672° N, 3.42414° E
- Hydrocarbons in
- Sognefjord Fm · Late Jurassic
Well history
WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE
General
Well 31/2-16 S was drilled as an appraisal in the Troll-West Oil province in the Northern North Sea. It was located on the crestal part of the Oil Province close to well 31/2-5. The primary objective was to drill hole and prepare for a long term production from a horizontal well drilled 5 m above the oil/water contact in the 23.5 m thick oil column. The length of the horizontal section should preferably be 500 m.
Operations and results
Appraisal well 31/2-16 S was spudded with the semi-submersible installation Deepsea Bergen on 27 September 1989 and drilled to TD at 2390 m ( 1587 m TVD RKB) in the Late Jurassic Sognefjord Formation. The well was drilled vertical down to 1118 m in the 17 1/2" section and kicked of from there, building angle up to a horizontal well path from ca 1950 m. Problems with tight hole, lost circulation and hard formation (stringers) were encountered repeatedly in the 17 1/2 and 12 1/4" sections from 1015 to 1891 m. The well was drilled with sea water and hi-vis pills down to 1015 m and with Versaport oil based mud from 1015 m to 1891 m, and with a super-saturated NaCl / polymer mud from 1891 m to TD. During well completion and preparation for production testing the screen-packer stuck at 570 m. Close to eight days were lost in milling and retrieving the fish before normal operations could be resumed.
The Sognefjord Formation was encountered at 1659 m (1533 m TVD RKB). The established gas/oil contact in the Troll Field is at 1547 m MSL TVD, which is 1.5 m deeper than observed in this well. This 1.5 m is within the uncertainty of the TVD calculations, and a common gas/oil contact is assumed.
No conventional or side wall cores were cut. No wire line pressure tests or fluid samples were taken. Apart from runs 1A, wire line logging was performed by the use of pipe conveyed Logging Systems. MWD was the only deep resistivity measuring device through the whole well.
After d
Around this wellbore
This wellbore on Sodir FactPages →
About this data
Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.
Developers: this page as JSON is GET /v1/data/norway/wells/1453, documented in the API reference.