NORWAY · WELLBORES · NPDID 1494

25/7-2

Exploration · Wildcat · P&A · Gas/condensate · Conoco Norway Inc. · PL 103

7 documents: reports, logs, and plots →

25/7-2 is a wildcat exploration wellbore in the North Sea, drilled by Conoco Norway Inc., entered Feb 8, 1990, to 4,850 m in the Sleipner Fm.

Discovery 25/7-2 · On the map →

4,850
m total depth · 4,847 m vertical
124
m water depth
Feb 8, 1990
entered · completed Jul 18, 1990
Sleipner Fm
at total depth · Middle Jurassic
73.7
m of core in 6 cores
163
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED MAR 1, 2026 · RELEASED JUL 18, 1992

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
DYVI STENA · Semisub steel
Drilling days
161
Kelly bushing elevation
25 m
Maximum inclination
12.89999962°
Drilling permit
628-L
Licensing round
9
Plugged and abandoned
—
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
59.27461° N, 2.20725° E
Hydrocarbons in
Intra Draupne Fm Ss · Late Jurassic
Hydrocarbons in
Hugin Fm · Middle Jurassic

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

Norwegian Continental Shelf Block 25/7 is located west of the Utsira basement High on the eastern flank of the Southern Viking Graben. The location is 5.3 km southwest of 25/7-1 which drilled into basement after the Cretaceous section without penetrating any Jurassic sediments and thus failed to test its target, Late Jurassic sandstones. With the 25/7-2 location further to the west one expected to penetrate a complete Brae analogue sequence. The main objectives of the well were to test the hydrocarbon potential of the Late Jurassic sands, the hydrocarbon potential of a structural closure at the Middle Jurassic sand level, and the hydrocarbon bearing potential of the Paleocene Heimdal sands. Trapping at Late and Middle Jurassic was assumed by sealing basement rocks to the east, and by dip closure elsewhere. Events interpreted as possible gas bearing sands occur between 200 and 300 m below sea level.

Operations and results

Wildcat well 25/7-2 was spudded 8 February 1990by the semi-submersible rig Dyvi Stena, and completed 18 July 1990 at a depth of 4850 m in the Middle Jurassic Sleipner Formation. The well was drilled with Seawater and hi-vis pills down to 1220 m and with KCl Polymer WBS/200 mud from 1220 m to TD. Drilling took 131 days from spud and 142 days from taking over the rig. A further 29 days were used to log, test, and plug and abandon the well. The rig was on contract for a total of 171 days. One hundred and thirty days were used for planned operations while wait-on-weather, fishing operations, and equipment trouble accounted for the NPT. No indications of shallow gas were observed.

Forty-seven metres of Cenomanian sand was encountered in the well. A gross thickness of 174 meters of hydrocarbon bearing Late Jurassic conglomerates and sandstones were encountered in the well. The Late Jurassic conglomerates and sandstones represent deposition by debris-flows, slumps and slides and minor turbidites on a fault-scarp

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/1494, documented in the API reference.