NORWAY · WELLBORES · NPDID 1494
25/7-2
Exploration · Wildcat · P&A · Gas/condensate · Conoco Norway Inc. · PL 103
25/7-2 is a wildcat exploration wellbore in the North Sea, drilled by Conoco Norway Inc., entered Feb 8, 1990, to 4,850 m in the Sleipner Fm.
Discovery 25/7-2 · On the map →
- 4,850
- m total depth · 4,847 m vertical
- 124
- m water depth
- Feb 8, 1990
- entered · completed Jul 18, 1990
- Sleipner Fm
- at total depth · Middle Jurassic
- 73.7
- m of core in 6 cores
- 163
- °C bottom-hole temperature
SODIR FACTPAGES · RECORD UPDATED MAR 1, 2026 · RELEASED JUL 18, 1992
On file for this wellbore
What the Directorate holds from this wellbore. Each opens the section that lists it.
Drilling
- Drilling facility
- DYVI STENA · Semisub steel
- Drilling days
- 161
- Kelly bushing elevation
- 25 m
- Maximum inclination
- 12.89999962°
- Drilling permit
- 628-L
- Licensing round
- 9
- Plugged and abandoned
- —
- Core samples available
- Yes
- Cuttings samples available
- Yes
- Position · ED50
- 59.27461° N, 2.20725° E
- Hydrocarbons in
- Intra Draupne Fm Ss · Late Jurassic
- Hydrocarbons in
- Hugin Fm · Middle Jurassic
Well history
WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE
General
Norwegian Continental Shelf Block 25/7 is located west of the Utsira basement High on the eastern flank of the Southern Viking Graben. The location is 5.3 km southwest of 25/7-1 which drilled into basement after the Cretaceous section without penetrating any Jurassic sediments and thus failed to test its target, Late Jurassic sandstones. With the 25/7-2 location further to the west one expected to penetrate a complete Brae analogue sequence. The main objectives of the well were to test the hydrocarbon potential of the Late Jurassic sands, the hydrocarbon potential of a structural closure at the Middle Jurassic sand level, and the hydrocarbon bearing potential of the Paleocene Heimdal sands. Trapping at Late and Middle Jurassic was assumed by sealing basement rocks to the east, and by dip closure elsewhere. Events interpreted as possible gas bearing sands occur between 200 and 300 m below sea level.
Operations and results
Wildcat well 25/7-2 was spudded 8 February 1990by the semi-submersible rig Dyvi Stena, and completed 18 July 1990 at a depth of 4850 m in the Middle Jurassic Sleipner Formation. The well was drilled with Seawater and hi-vis pills down to 1220 m and with KCl Polymer WBS/200 mud from 1220 m to TD. Drilling took 131 days from spud and 142 days from taking over the rig. A further 29 days were used to log, test, and plug and abandon the well. The rig was on contract for a total of 171 days. One hundred and thirty days were used for planned operations while wait-on-weather, fishing operations, and equipment trouble accounted for the NPT. No indications of shallow gas were observed.
Forty-seven metres of Cenomanian sand was encountered in the well. A gross thickness of 174 meters of hydrocarbon bearing Late Jurassic conglomerates and sandstones were encountered in the well. The Late Jurassic conglomerates and sandstones represent deposition by debris-flows, slumps and slides and minor turbidites on a fault-scarp
Around this wellbore
This wellbore on Sodir FactPages →
About this data
Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.
Developers: this page as JSON is GET /v1/data/norway/wells/1494, documented in the API reference.