NORWAY · WELLBORES · NPDID 150
9/4-1
Exploration · Wildcat · P&A · Shows · Conoco Norway Inc. · PL 013
9/4-1 is a wildcat exploration wellbore in the North Sea, drilled by Conoco Norway Inc., entered Mar 31, 1968, to 2,963 m in the Zechstein Gp.
- 2,963
- m total depth
- 68
- m water depth
- Mar 31, 1968
- entered · completed May 19, 1968
- Zechstein Gp
- at total depth · Late Permian
- —
- m of core
- 75
- °C bottom-hole temperature
SODIR FACTPAGES · RECORD UPDATED FEB 20, 2026 · RELEASED MAY 19, 1970
On file for this wellbore
What the Directorate holds from this wellbore. Each opens the section that lists it.
Drilling
- Drilling facility
- ENDEAVOUR · Jack-up 3 legs
- Drilling days
- 50
- Kelly bushing elevation
- 29 m
- Maximum inclination
- 5.25°
- Drilling permit
- 11-L
- Licensing round
- 1-A
- Plugged and abandoned
- —
- Core samples available
- Yes
- Cuttings samples available
- No
- Position · ED50
- 57.58389° N, 4.02028° E
Well history
WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE
General
Well 9/4-1 is situated northeast in the Åsta Graben in the Danish-Norwegian Basin. The chosen well location allowed multiple Tertiary to Mesozoic prospects to be tested. The primary objectives of 9/4-1 were Middle Jurassic and Early Triassic (Bunter) sandstones, while basal Tertiary and Early Cretaceous sandstones and Late Cretaceous limestones were secondary objectives.
The well is Type Well for the Egersund Formation.
Operations and results
Wildcat well 9/4-1 was spudded with the jack-up installation Endeavour on 31 Marc 1968 and drilled to TD at 2963 m in Late Permian Zechstein salt. Three casing strings were set in the hole. Seawater was used as drilling fluid down to 1106 m, from where an XP-20 lignosulphonate type mud was used. When the drilling commenced after the 30" conductor pipe was set, several drilling problems arose. The circulation was lost, and the hole fell in repeatedly, so the conductor pipe had to be re-driven and cemented several times until the hole conditions allowed the 20" casing to be set. At 2963 m the drill pipe stuck in salt, and after five days of unsuccessful fishing operations, it was decided to abandon the hole. The lower part of the hole could not be logged due to the unrecovered fish.
Twenty-five net meter of Jurassic sandstone was penetrated in a sand body (Sandnes Formation) at 2288 m. The section was water wet, but fair shows were logged in the upper 5 m of the sand. The remainder had very scattered poor shows. Porosity averaged 25 percent and examination of sidewall cores indicated a clean permeable sandstone reservoir. The second primary objective, the Bunter Sandstone, was represented by an estimated 60 m of thin interbedded sands and sandstones scattered throughout a thick Triassic section composed predominantly of silty red brown to pastel claystones. Due to lack of logs the interpretation of the Triassic section is somewhat tentative. Late Cretaceous Chalk
Around this wellbore
This wellbore on Sodir FactPages →
About this data
Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.
Developers: this page as JSON is GET /v1/data/norway/wells/150, documented in the API reference.