NORWAY · WELLBORES · NPDID 1513
6407/7-2 R
Exploration · Appraisal · P&A · Oil · Norsk Hydro Produksjon AS · Njord · PL 107
6407/7-2 R is an appraisal exploration wellbore in the Norwegian Sea, drilled by Norsk Hydro Produksjon AS, entered Mar 7, 1990, to 3,322 m in the Red Beds (informal).
Discovery 6407/7-1 S Njord · On the map →
- 3,322
- m total depth · 3,321 m vertical
- 338
- m water depth
- Mar 7, 1990
- entered · completed Apr 30, 1990
- Red Beds (informal)
- at total depth · Late Triassic
- —
- m of core
- 113
- °C bottom-hole temperature
SODIR FACTPAGES · RECORD UPDATED NOV 4, 2026 · RELEASED APR 30, 1992
On file for this wellbore
What the Directorate holds from this wellbore. Each opens the section that lists it.
Drilling
- Drilling facility
- VILDKAT EXPLORER · Semisub steel
- Drilling days
- 55
- Kelly bushing elevation
- 25 m
- Maximum inclination
- 4°
- Drilling permit
- 532-L2
- Licensing round
- 9
- Plugged and abandoned
- Jul 20, 2000
- Core samples available
- No
- Cuttings samples available
- No
- Position · ED50
- 64.25733° N, 7.17851° E
- Hydrocarbons in
- Ile Fm · Middle Jurassic
- Hydrocarbons in
- Tilje Fm · Early Jurassic
Well history
WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE
General
Well 6407/7-2 R is a re-entry of well 6407/7-2 on the Njord Discovery. The purpose of the re-entry was to conduct a long term production test in order to determine the fault compartment volume, to determine the threshold pressures and degree of communication through faults, to establish the intervals contributing to the flow, to determine reservoir productivity and initial reservoir conditions, and to obtain representative fluid samples.
Operations and results
Well 6407/7-2 was re-entered with the semi-submersible installation Vildkat Explorer on 7 March 1990.
Two test strings were run sequentially. The first string was a test string to enable a conventional well test to be conducted. Most of the upper part of this test string was later pulled and replaced by an abandonment string with gauges to allow long term monitoring of the main build up.
The gauges were programmed to record data over a period of 4 to 6 months. The well was subsequently abandoned for later re-entry and retrieval of the gauges and permanent abandonment.
Testing
A conventional long-term production test was carried out from the combined intervals 2773.3 - 2778.3 m, 2781.3 - 2797.8 m, 2803.8 - 2839.3 m, and 2844.3 - 2879.3 m. In the main flow the test produced 853 Sm3 oil and 173650 Sm3 gas through a 20.64 mm choke. The GOR was 203 Sm3/Sm3, the oil density was 0.800 g /cm3, and the gas gravity was 0.714 (air = 1). The maximum down hole temperature in the test was 113.3 deg C, recorded at the PLT at 2754.4 m. This is estimated to be the initial reservoir temperature at mid-perforations, 2826.3 m.
Around this wellbore
This wellbore on Sodir FactPages →
About this data
Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.
Developers: this page as JSON is GET /v1/data/norway/wells/1513, documented in the API reference.