NORWAY · WELLBORES · NPDID 1534

25/1-7 R4

Exploration · Appraisal · P&A · Gas · Elf Petroleum Norge AS · Frigg · PL 024

25/1-7 R4 is an appraisal exploration wellbore in the North Sea, drilled by Elf Petroleum Norge AS, entered Mar 28, 1990, to 2,716 m in the Jorsalfare Fm.

Discovery 25/1-1 Frigg · On the map →

2,716
m total depth · 2,715 m vertical
101
m water depth
Mar 28, 1990
entered · completed Apr 5, 1990
Jorsalfare Fm
at total depth · Late Cretaceous
—
m of core
—
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED FEB 20, 2026 · RELEASED APR 5, 1992

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
WEST VANGUARD · Semisub steel
Drilling days
9
Kelly bushing elevation
22 m
Maximum inclination
3.70000005°
Drilling permit
455-L5
Licensing round
2-A
Plugged and abandoned
Apr 5, 1990
Core samples available
No
Cuttings samples available
No
Position · ED50
59.91897° N, 2.08120° E
Hydrocarbons in
Frigg Fm · Eocene

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

Well 25/1-7 was drilled on the main Frigg structure close to the UK border. The Frigg Field was discovered by well 25/1-1 in 1971. Production from the field started in 1977. A main objective of well 25/1-7 was to establish a reference monitoring station for the production of gas from the Frigg Field. The 25/1-7 R4 was the fourth and last re-entry of the well.The purpose was to log the fluid contacts, and to perform permanent plugging and abandonment.

Operations and results

Appraisal well 25/1-7 R4 was connected and re-entered with the semi-submersible installation West Vanguard on 28 March 1990.

The well was logged (2054.5 - 1913 m) through casing with a Thermal Neutron Decay (TDT) log to determine the fluid contacts. The gas/water contact was found at 1912.2 m MSL, an 8.0 m rise of the water level since April 1989, and a 35.8 m total rise compared to the Frigg pre-production gas/oil contact in the area. A cased hole RFT run was also performed, and the pressure was measured at 1897.2 m, 1919.2 m, 1932.2 m, and at 1961.2 m.

The well was permanently abandoned on 5 April 1990 as a gas appraisal well.

Testing

No drill stem test was performed.

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/1534, documented in the API reference.