NORWAY · WELLBORES · NPDID 156

7/11-2

Exploration · Appraisal · P&A · Gas/condensate · Phillips Petroleum Company Norway · Cod · PL 018

32 documents: reports, logs, and plots →

7/11-2 is an appraisal exploration wellbore in the North Sea, drilled by Phillips Petroleum Company Norway, entered Jul 21, 1968, to 3,427 m in the Tor Fm.

Discovery 7/11-1 Cod · On the map →

3,427
m total depth
82
m water depth
Jul 21, 1968
entered · completed Oct 14, 1968
Tor Fm
at total depth · Late Cretaceous
15.6
m of core in 1 core
125
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED NOV 4, 2026 · RELEASED OCT 14, 1970

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
OCEAN TRAVELER · Semisub steel
Drilling days
86
Kelly bushing elevation
27 m
Maximum inclination
2°
Drilling permit
17-L
Licensing round
1-A
Plugged and abandoned
—
Core samples available
Yes
Cuttings samples available
No
Position · ED50
57.07089° N, 2.40736° E
Hydrocarbons in
Forties Fm · Paleocene

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

Well 7/11-2 was drilled , ca 1.5 km from the UK Border on the eastern side of the Breiflabb Basin in the southern North Sea. The objective was to test the hydrocarbon potential in the Paleocene on the west flank of the Cod structure, and to confirm the gas and condensate discovery made by the 7/11-1 well. Well 7/11-1 tested up to 430 Sm3 condensate and 1254000 Sm3 gas /day from the Late Paleocene Forties Formation.

Operations and results

Appraisal well 7/11-2 was spudded with the semi-submersible installation Ocean Traveller on 21 July 1968 and drilled to TD at 3427 m in the Late Cretaceous Tor Formation. Tight hole was experienced when pulling out of the 17 12" hole. The hole was washed back to TD and mud weight increased to 14 ppg. Logging and casing operations could then be successfully carried out. The well was drilled with sea water down to 1219 m where the system was changed to a salt-saturated Drispac-Desco-Flosal type.

The well tested gas and condensate in Paleocene sandstones (the Forties Formation).

One core was taken in the Paleocene sandstone in the interval 3030.6 m to 3045 m. No wire line fluid samples were taken.

The well was permanently abandoned on as a dry well.

Testing

Three drill stem tests were performed.

DST 1 tested the interval 3166.3 m to 3192.5 m. This test produced only 3.7 m3 salt water-cut mud and mud filtrate.

DST2 tested the interval 3027.3 m to 3105.9 m.

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/156, documented in the API reference.