16/4-2 is a wildcat exploration wellbore in the North Sea, drilled by Norsk Hydro Produksjon AS, entered Jun 29, 1990, to 3,117 m in the Intra Draupne Fm Ss.

On the map →

3,117
m total depth · 3,117 m vertical
93
m water depth
Jun 29, 1990
entered · completed Jul 29, 1990
Intra Draupne Fm Ss
at total depth · Late Jurassic
6.2
m of core in 1 core
115
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED MAR 1, 2026 · RELEASED JUL 29, 1992

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
VILDKAT EXPLORER · Semisub steel
Drilling days
31
Kelly bushing elevation
25 m
Maximum inclination
2.5999999°
Drilling permit
639-L
Licensing round
8
Plugged and abandoned
—
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
58.59644° N, 2.03001° E

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

Well 16/4-2 was the second well on the block and last commitment well for license 087. The well is located in a central position on the structure, close to the western border of the block. The main target was sands of Middle Eocene age supposed to be present within a mounded seismic sequence that constitutes the eastern part of the Alpha prospect in the Sleipner Field. The primary objective of the well was to prove oil in the Eocene sandstones. Secondary objectives were to confirm the seismic interpretation and the geological model for the Eocene sand; to test a possible small closure at top Heimdal Formation level; to obtain additional information on migration paths in the area; to confirm the seismic interpretation of the basal Cretaceous/ Late Jurassic sequence; and to test the hydrocarbon potential of possible Late Jurassic sand accumulations. Shallow gas could be expected at 537 m. This corresponds to the level of the blowout in well 16/4-1. A possible shallow gas content could occur in a thin sand layer at 685 m, which was correlated from well 16/4-1.

Operations and results

Wildcat well 16/4-2 was spudded with the semi-submersible installation Vildkat Explorer 29 June 1990 and drilled to 3117 m in Intra Draupne Formation sandstones. No shallow gas was encountered in the well; the gas zones were drilled with riser and mud weight 1.22 rd to control the gas. The well was drilled with seawater and hi-vis pills down to 1710 m and with KCl Polymer mud from 1710 m to TD. Drilling went without any significant problems apart from the 13 3/8" casing getting stuck at 1450 m. To resolve this problem diesel EZ pills were used in the well bore. This affected gas readings throughout the well below 1710 m and gave some spuriously high readings. The 13 3/8" casing shoe was finally set at 1683 m, and the casing cemented. The Eocene Grid formation sandstone came in at 1913 m, approximately 88 m deeper than prognosed. No hydrocarbons we

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/1560, documented in the API reference.