7/8-1 is a wildcat exploration wellbore in the North Sea, drilled by Phillips Petroleum Company Norway, entered Aug 31, 1968, to 3,334 m in the Gassum Fm.

On the map →

3,334
m total depth
82
m water depth
Aug 31, 1968
entered · completed Feb 5, 1969
Gassum Fm
at total depth · Late Triassic
—
m of core
125
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED FEB 20, 2026 · RELEASED FEB 5, 1971

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
OCEAN VIKING · Semisub steel
Drilling days
159
Kelly bushing elevation
27 m
Maximum inclination
7°
Drilling permit
19-L
Licensing round
1-A
Plugged and abandoned
—
Core samples available
Yes
Cuttings samples available
No
Position · ED50
57.32239° N, 2.47467° E

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

Well 7/8-1 was drilled on an anticlinal structure in the westernmost part of the Norwegian-Danish Basin and marginal to the northern slope of the Central Through. The anticline was interpreted as a salt-induced structure with closure at top Paleocene and top Cretaceous, and these horizons were defined as the main objectives of the well. The well should be drilled into Permian salt with prognosed top at 3261 m (10700 ft).

Operations and results

Wildcat well 7/8-1 was spudded with the semi-submersible installation Ocean Viking on 31 August 1968 and drilled to TD at 3334 m in Triassic sediments of the Gassum Formation. The well did not reach the planned TD in Permian salt.

Drilling went without significant problems down to 1981 m. From this depth on, several drilling problems arose. After the casing had parted at two places the well had to be sidetracked from 1831 m. This hole was then drilled to 3334 m, which is recorded as TD for the well. At this depth the well kicked and the mud density was increased from 12.3 ppg to 12.8 ppg. While circulating, the hole gave up mud and sloughing finally caused the pipe to stick. After having backed off the drill pipe and displaced the hole with 14.0 ppg mud, a high pressure was observed on the drill pipe and the mud system density was increased to 14.3 ppg. Several mud conditioning operations were necessary until the well seemed dead. After recovering 2650 m of drill pipe out of the hole the well was plugged from 2657 m to 2469 m and displaced with 14.7 ppg mud. A second sidetracked hole was then drilled from 2538 m to 3316 m where the final logs were run. The operations were also delayed significantly by severe weather conditions in December and January. The well was drilled with seawater and high viscosity pills down to 1166 m, and with a saturated salt water mud from 1166 m to TD. Below 1920 m the mud contained from 2 - 6 % oil.

Both objective formations were encountered. However, both were thinner tha

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/158, documented in the API reference.