NORWAY · WELLBORES · NPDID 159

7/11-3

Exploration · Appraisal · P&A · Oil shows · Phillips Petroleum Company Norway · Cod · PL 018

26 documents: reports, logs, and plots →

7/11-3 is an appraisal exploration wellbore in the North Sea, drilled by Phillips Petroleum Company Norway, entered Oct 17, 1968, to 3,350 m in the Ekofisk Fm.

Discovery 7/11-1 Cod · On the map →

3,350
m total depth
79
m water depth
Oct 17, 1968
entered · completed Feb 7, 1969
Ekofisk Fm
at total depth · Paleocene
37
m of core in 3 cores
133
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED NOV 4, 2026 · RELEASED FEB 7, 1971

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
OCEAN TRAVELER · Semisub steel
Drilling days
114
Kelly bushing elevation
27 m
Maximum inclination
3.70000005°
Drilling permit
20-L
Licensing round
1-A
Plugged and abandoned
—
Core samples available
Yes
Cuttings samples available
No
Position · ED50
57.04967° N, 2.47189° E

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

Well 7/11-3 was drilled ca 3.5 km south-east of the 7/11-1 Cod discovery well on the eastern side of the Breiflabb Basin in the southern North Sea. The objective was to test the extension of the Paleocene sands that were found hydrocarbon bearing in wells 7/11-1 and 7/11-2.

Operations and results

Appraisal well 7/11-3 was spudded with the semi-submersible installation Ocean Traveller on 17 October 1968 and drilled to TD at 3350 m. The hole collapsed when drilling a shale section between 1950 m and 2300 m. Bridging took place until the mud weight was increased to 14.5 ppg. Otherwise the well was drilled without significant problems. The well was drilled with a Drispac-Flosal-Desco system, which was salt saturated when drilling the lower part of the hole.

Minor amounts of oil and gas was tested in a Forties Formation sandstone sequence correlated to the best sandstone sequences that were tested in the two first Cod wells.

Three cores were cut in the intervals 3074.2 to 3082 m, 3092.8 to 3105 m, and 3160.3 to 3177.2 m. No wire line fluid samples were taken.

The well was permanently abandoned on 7 January 1969 as an oil appraisal well.

Testing

Eight drill stem testes were carried out.

DST 1 tested the interval 3239.7 to 3246.4 m. It produced a total of 15 m3 diesel cushion, mud and water. Bottom hole temperature was 129 deg C.

DST 2 tested the interval 3210.2 to 3231.8 m. It produced a total of

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/159, documented in the API reference.