NORWAY · WELLBORES · NPDID 1600
35/9-2
Exploration · Wildcat · P&A · Oil/gas · Norsk Hydro Produksjon AS · Gjøa · PL 153
35/9-2 is a wildcat exploration wellbore in the North Sea, drilled by Norsk Hydro Produksjon AS, entered Jan 1, 1991, to 2,885 m in the Basement.
Discovery 35/9-2 · On the map →
- 2,885
- m total depth · 2,877 m vertical
- 367
- m water depth
- Jan 1, 1991
- entered · completed Apr 3, 1991
- Basement
- at total depth · Pre-Devonian
- 394.1
- m of core in 17 cores
- 100
- °C bottom-hole temperature
SODIR FACTPAGES · RECORD UPDATED NOV 4, 2026 · RELEASED APR 3, 1993
On file for this wellbore
What the Directorate holds from this wellbore. Each opens the section that lists it.
Drilling
- Drilling facility
- VILDKAT EXPLORER · Semisub steel
- Drilling days
- 92
- Kelly bushing elevation
- 25 m
- Maximum inclination
- 14°
- Drilling permit
- 663-L
- Licensing round
- 12
- Plugged and abandoned
- —
- Core samples available
- Yes
- Cuttings samples available
- Yes
- Position · ED50
- 61.33573° N, 3.93798° E
- Hydrocarbons in
- Sognefjord Fm · Late Jurassic
- Hydrocarbons in
- Fensfjord Fm · Middle Jurassic
Well history
WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE
General
Well 35/9-2 was designed to drill on the A-Structure in block 35/9 which is located in the northern part of the Horda Platform, in the footwall of the Sogn Graben boundary fault system. The well was drilled as a combined appraisal/wildcat well. The primary objective of the well was to appraise the hydrocarbon potential in the Late Jurassic Sognefjord and Fensfjord Formations, found oil and gas bearing in the 35/9-1 well. Secondary objective was to test the Middle -Early Jurassic sequence.
The total depth of the well was prognosed to 2830 m RKB, approximately 30 m into the Caledonian basement.
Operations and results
Wildcat/Appraisal well 35/9-2 was spudded with the semi-submersible installation Vildkat Explorer on 1 January 1991 and drilled to TD at 2885 m in Caledonian basement. Due to hole angle problems, the well had to be re-spudded twice before drilling proceeded. No shallow gas or boulders were observed while drilling. In order to penetrate the target within the given tolerances, a kick-off was made at 1039 m. This resulted in a deviation of up to 14 deg. at 1287 m and TVD 8 m less than measured depth at final TD. The well was drilled with seawater and hi-vis pills down to 1018 m and with KCl/polymer from 1018 m to TD.
The well encountered oil and gas bearing sandstones from 2095 m in the Late Jurassic reservoirs. The gas/oil contact was found at 2324 m and oil was found down to 2341 m in the Fensfjord "C" Formation. Net pay gas zone was calculated to 171.26 m and net oil pay zone calculated to 13.13 m. The oil/water contact was not seen, but from extrapolation of RFT pressure gradients the OWC was estimated at 2367 m in the Fensfjord Formation. The best reservoir sand was found in the Sognefjord Formation. The Middle and Early Jurassic formations were penetrated and found water bearing. Above the Late Jurassic reservoirs only two weak shows were recorded in cuttings from thin sandstone stringers
Around this wellbore
This wellbore on Sodir FactPages →
About this data
Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.
Developers: this page as JSON is GET /v1/data/norway/wells/1600, documented in the API reference.