NORWAY · WELLBORES · NPDID 1643
7229/11-1
Exploration · Wildcat · P&A · Dry · A/S Norske Shell · PL 183
7229/11-1 is a wildcat exploration wellbore in the Barents Sea, drilled by A/S Norske Shell, entered Aug 9, 1993, to 4,630 m in the Ørn Fm.
- 4,630
- m total depth · 4,627.7 m vertical
- 284
- m water depth
- Aug 9, 1993
- entered · completed Dec 15, 1993
- Ørn Fm
- at total depth · Late Carboniferous
- 180.5
- m of core in 9 cores
- 140
- °C bottom-hole temperature
SODIR FACTPAGES · RECORD UPDATED MAR 1, 2026 · RELEASED DEC 15, 1995
On file for this wellbore
What the Directorate holds from this wellbore. Each opens the section that lists it.
Drilling
- Drilling facility
- ROSS RIG (2) · Semisub steel
- Drilling days
- 129
- Kelly bushing elevation
- 24 m
- Maximum inclination
- 4.05000019°
- Drilling permit
- 767-L
- Licensing round
- 13
- Plugged and abandoned
- —
- Core samples available
- Yes
- Cuttings samples available
- Yes
- Position · ED50
- 72.21590° N, 29.64160° E
Well history
WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE
General
Well 7229/11-1 was the first well drilled in Production Licence 183 following the interpretation of a 3D seismic survey acquired in 1991. The well is situated on the northeastern part of the Finnmark Platform. The target of the well was the "Castor" prospect, consisting of two Permian-Carboniferous (Sakmarian to Asselian age) carbonate build-ups confined in combined dip-closed and stratigraphic traps. The objectives were to test the hydrocarbon potential of the carbonate build-ups, referred to as Carbonate 1 and Carbonate 2 respectively, to acquire additional information on the Permian-Carboniferous of the Finnmark Platform, and to calibrate the seismic expression of the build-ups.
Operations and results
Exploration well was spudded with the semi-submersible installation "Ross Rig" on 9 August 1993 and drilled to a total depth of 4630 m in limestone of Middle - Lower? Carboniferous age. The well was drilled with sea water and hi-vis pre-hydrated bentonite pills down to 1098 m, with KCl / polymer mud from 1098 m to 3012 m, and with a high-temperature KCl / Polymer mud from 3012 m to TD. The soft seabed did not present anchoring problems. No shallow gas was encountered. Drilling problems were experienced in the interval 339 m & 379 m. A seismic marker (black loop) corresponds to the top of this interval, which is interpreted as a boulder rich sequence. Drilling problems could have been due to boulders to fall into the hole and become wedged, thus causing sticking. The predicted carbonate build-up targets were encountered but were not reservoir facies. Carbonate 1 was confirmed to be build-up / build-up flank facies; Carbonate 2 was found to be carbonate platform facies. No hydrocarbon shows were encountered in the well. Nine cores totalling 180.9 metres length were successfully cut and retrieved from the Permian-Carboniferous. No hydrocarbon shows were encountered in the well. The well was plugged and abandoned as a dry hole on 15 Dec
Around this wellbore
This wellbore on Sodir FactPages →
About this data
Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.