NORWAY · WELLBORES · NPDID 1683
34/8-4 S
Exploration · Wildcat · P&A · Gas/condensate · Norsk Hydro Produksjon AS · Visund · PL 120
34/8-4 S is a wildcat exploration wellbore in the North Sea, drilled by Norsk Hydro Produksjon AS, entered Dec 6, 1990, to 4,150 m in the Teist Fm (informal).
Discovery 34/8-4 S · On the map →
- 4,150
- m total depth · 3,802 m vertical
- 309
- m water depth
- Dec 6, 1990
- entered · completed Jun 9, 1991
- Teist Fm (informal)
- at total depth · Triassic
- 354.6
- m of core in 17 cores
- 137
- °C bottom-hole temperature
SODIR FACTPAGES · RECORD UPDATED NOV 4, 2026 · RELEASED JUN 9, 1993
On file for this wellbore
What the Directorate holds from this wellbore. Each opens the section that lists it.
Drilling
- Drilling facility
- MÆRSK JUTLANDER · Semisub steel
- Drilling days
- 186
- Kelly bushing elevation
- 23 m
- Maximum inclination
- 56.29999924°
- Drilling permit
- 659-L
- Licensing round
- 10-A
- Plugged and abandoned
- —
- Core samples available
- Yes
- Cuttings samples available
- Yes
- Position · ED50
- 61.32488° N, 2.42185° E
- Hydrocarbons in
- Rannoch Fm · Middle Jurassic
- Hydrocarbons in
- Lunde Fm · Late Triassic
Well history
WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE
General
Well 34/8-4 S is located on the Visund Field, A structure where previous wells 3/8-1, 3/8-3, and 3/8-3 A had proved hydrocarbons in the Brent Group. The main target in 34/8-4 S was the hydrocarbon potential in the Lomvi Formation on the A-structure. Secondary targets were the hydrocarbon potentials of the Statfjord and Lunde B/C formations on the A south compartment. Pressure measurement should be acquired from the Lunde- and Lomvi Formations in order to evaluate the sealing potential of the Middle to Late Triassic sequence. The well was designed for temporary abandonment and re-entry as a subsea producer. The well was planned as a deviated hole to penetrate top Statfjord, Lunde B/C and the Lomvi Formations within structural closure, leaving more than 10 mill Sm3 oil untested up-dip. Boulders could be encountered between 350 m and 395 m. Two intervals with possibility for shallow gas were identified at 446 m and 477 m.
Operations and results
Wildcat well 34/8-4 S was spudded with the semi-submersible installation Maersk Jutlander on 6 Desember 1991 and drilled to TD at 4150 m in rocks of Triassic age. Drilling started with an 8 1/2" pilot hole checking for shallow gas. No boulders or shallow gas was encountered. Significant technical problems were encountered during drilling of this well and one third of the total rig time was counted as down time. The longest period of down time occurred after TD in the 17 1/2" hole where 31.6 days were spent repairing the BOP and wellhead. The planned TD at 4478 m was not reached due to operational problems. The pipe was backed off at 3936 m and the borehole was logged from this depth and up to the 9 5/8" casing shoe. The well was drilled vertical down to ca 2310 m where it started to build angle up to 30 ° at ca 2680 m. From here to TD the deviation varied between 30 ° and 50 °. The well was drilled with spud mud and seawater down to 1165 m, with KCl / polymer mud from 1165 m to
Around this wellbore
This wellbore on Sodir FactPages →
About this data
Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.