NORWAY · WELLBORES · NPDID 1699

6407/7-5

Exploration · Appraisal · P&A · Shows · Norsk Hydro Produksjon AS · Njord · PL 107

6 documents: reports, logs, and plots →

6407/7-5 is an appraisal exploration wellbore in the Norwegian Sea, drilled by Norsk Hydro Produksjon AS, entered Dec 17, 1990, to 3,725 m in the Åre Fm.

Discovery 6407/7-1 S Njord · On the map →

3,725
m total depth · 3,716 m vertical
327
m water depth
Dec 17, 1990
entered · completed Feb 15, 1991
Åre Fm
at total depth · Early Jurassic
106.2
m of core in 5 cores
140
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED NOV 4, 2026 · RELEASED FEB 15, 1993

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
TRANSOCEAN 8 · Semisub steel
Drilling days
61
Kelly bushing elevation
24 m
Maximum inclination
11.30000019°
Drilling permit
660-L
Licensing round
9
Plugged and abandoned
—
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
64.30676° N, 7.18072° E

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

The Njord Field is situated in the southern part of the Haltenbanken area in a down faulted position relative to the Trøndelag Platform and the Frøya High. Oil had been encountered in previous wells on Njord in the Ile, Tilje, and Åre Formations. Well 6407/7-5 is located on the North II fault segment on the North Flank of the Njord structure. The main objectives for the well were to test the resource potential of the Northern Flank, to clarify the number of production and injection wells needed for development, and to verify the reservoir quality and the sealing potential of faults. The pore pressure gradient was expected to be maximum 1.54 rd in the reservoir. Shallow gas warnings were given for 6 levels down to 650 m. Planned TD was 3725 m

Operations and results

Well 6407/7-5 was spudded with the semi-submersible installation Transocean 8 on 15 February 1991 and drilled to TD at 3725 m in Early Jurassic sediments of the Åre Formation. After coring the interval 3168 - 3215m the drilling assembly got stuck when running in the hole. Fishing the drilling assembly failed and the well was subsequently plugged back and side tracked from 3080 m. Indications of shallow gas were found in two of the six warned levels. The well was drilled with spud mud down to 1112 m and with KCl/polymer mud from 1112 m to TD.

The reservoir sandstones of the Ile, Ror and Tilje Formations were found to be water bearing. RFT pressures and one segregated sample indicated very poor permeabilities in the sandstone intervals tested. From the data it was not possible to determine whether pressure communication exists between 6407/7-5 and 6407/7-3.

Sporadic oil shows were recorded on sandstone stringers in the Nise Formation below 2267 m. Weak oil shows were recorded on claystones, limestones and sandstones of the Lysing Formation between 3000 - 3084 m. This interval also had high gas readings with gas peaks up to 10%. Some oil shows were s

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/1699, documented in the API reference.