NORWAY · WELLBORES · NPDID 1719
34/8-5
Exploration · Appraisal · P&A · Shows · Norsk Hydro Produksjon AS · Visund · PL 120
34/8-5 is an appraisal exploration wellbore in the North Sea, drilled by Norsk Hydro Produksjon AS, entered Feb 18, 1991, to 3,540 m in the Lunde Fm.
Discovery 34/8-1 Visund · On the map →
- 3,540
- m total depth · 3,528 m vertical
- 297
- m water depth
- Feb 18, 1991
- entered · completed Apr 1, 1991
- Lunde Fm
- at total depth · Late Triassic
- 191.3
- m of core in 9 cores
- 113
- °C bottom-hole temperature
SODIR FACTPAGES · RECORD UPDATED NOV 4, 2026 · RELEASED APR 1, 1993
On file for this wellbore
What the Directorate holds from this wellbore. Each opens the section that lists it.
Drilling
- Drilling facility
- TRANSOCEAN 8 · Semisub steel
- Drilling days
- 43
- Kelly bushing elevation
- 23 m
- Maximum inclination
- 10.5°
- Drilling permit
- 667-L
- Licensing round
- 10-A
- Plugged and abandoned
- —
- Core samples available
- Yes
- Cuttings samples available
- Yes
- Position · ED50
- 61.32498° N, 2.34943° E
Well history
WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE
General
Well 34/8-5 is located on the A-structure on the Visund Field. This is a NNE-SSW oriented elongated fault block with the Pre-Cretaceous strata dipping towards WNW. The A-Central fault divides the A-structure into the A-North and A-South compartments. Well 34/8-5 was drilled on the southern part of the A-South compartment, ca 6 kilometres SSW of Visund Discovery well 34/8-1. The primary objective was to appraise the Jurassic Brent Group. A secondary objective was to test reservoir quality of an Oligocene submarine fan system. Possible shallow gas was predicted at 604 and 793 m.
Operations and results
Appraisal well 34/8-5 was spudded with the semi-submersible installation Transocean 8 on 18 February 1991 and drilled to TD at 3540 m (3528 m TVD) in the Late Triassic Lunde Formation. The 36" hole was drilled to TD at 406 m, but when attempting to stab in the 30" casing the hole could not be located. The well was re-spudded and this time with success. An 8 1/2" pilot hole was drilled from 406 m to 850 m to check for shallow gas. No gas was observed. The well was planned vertical, but built some angle below 2660 m, and at ca 2720 m the deviation was ca 10 deg. This angle kept down to TD resulting in a 12 m discrepancy between measured and vertical depth at TD. There were also some hole curable problems during logging, but otherwise operations proceeded without significant problems. The well was drilled with seawater and hi-vis pills down to 1197 m and with KCl/polymer mud from 1197 m to TD.
Thinly developed water bearing Oligocene and Eocene sands were encountered. The Brent Group was encountered at 2855 m and was found water bearing with oil shows on the cores. The shows continued down to 2977 m. Otherwise there w
Around this wellbore
This wellbore on Sodir FactPages →
About this data
Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.
Developers: this page as JSON is GET /v1/data/norway/wells/1719, documented in the API reference.