NORWAY · WELLBORES · NPDID 1719

34/8-5

Exploration · Appraisal · P&A · Shows · Norsk Hydro Produksjon AS · Visund · PL 120

7 documents: reports, logs, and plots →

34/8-5 is an appraisal exploration wellbore in the North Sea, drilled by Norsk Hydro Produksjon AS, entered Feb 18, 1991, to 3,540 m in the Lunde Fm.

Discovery 34/8-1 Visund · On the map →

3,540
m total depth · 3,528 m vertical
297
m water depth
Feb 18, 1991
entered · completed Apr 1, 1991
Lunde Fm
at total depth · Late Triassic
191.3
m of core in 9 cores
113
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED NOV 4, 2026 · RELEASED APR 1, 1993

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
TRANSOCEAN 8 · Semisub steel
Drilling days
43
Kelly bushing elevation
23 m
Maximum inclination
10.5°
Drilling permit
667-L
Licensing round
10-A
Plugged and abandoned
—
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
61.32498° N, 2.34943° E

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

Well 34/8-5 is located on the A-structure on the Visund Field. This is a NNE-SSW oriented elongated fault block with the Pre-Cretaceous strata dipping towards WNW. The A-Central fault divides the A-structure into the A-North and A-South compartments. Well 34/8-5 was drilled on the southern part of the A-South compartment, ca 6 kilometres SSW of Visund Discovery well 34/8-1. The primary objective was to appraise the Jurassic Brent Group. A secondary objective was to test reservoir quality of an Oligocene submarine fan system. Possible shallow gas was predicted at 604 and 793 m.

Operations and results

Appraisal well 34/8-5 was spudded with the semi-submersible installation Transocean 8 on 18 February 1991 and drilled to TD at 3540 m (3528 m TVD) in the Late Triassic Lunde Formation. The 36" hole was drilled to TD at 406 m, but when attempting to stab in the 30" casing the hole could not be located. The well was re-spudded and this time with success. An 8 1/2" pilot hole was drilled from 406 m to 850 m to check for shallow gas. No gas was observed. The well was planned vertical, but built some angle below 2660 m, and at ca 2720 m the deviation was ca 10 deg. This angle kept down to TD resulting in a 12 m discrepancy between measured and vertical depth at TD. There were also some hole curable problems during logging, but otherwise operations proceeded without significant problems. The well was drilled with seawater and hi-vis pills down to 1197 m and with KCl/polymer mud from 1197 m to TD.

Thinly developed water bearing Oligocene and Eocene sands were encountered. The Brent Group was encountered at 2855 m and was found water bearing with oil shows on the cores. The shows continued down to 2977 m. Otherwise there w

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/1719, documented in the API reference.