NORWAY · WELLBORES · NPDID 1754
6506/11-2
Exploration · Wildcat · P&A · Oil/gas · Den norske stats oljeselskap a.s · Åsgard · PL 134
6506/11-2 is a wildcat exploration wellbore in the Norwegian Sea, drilled by Den norske stats oljeselskap a.s, entered May 8, 1991, to 4,813 m in the Åre Fm.
Discovery 6506/11-2 (Isbjørn) · On the map →
- 4,813
- m total depth · 4,806 m vertical
- 297
- m water depth
- May 8, 1991
- entered · completed Oct 26, 1991
- Åre Fm
- at total depth · Early Jurassic
- 311.7
- m of core in 15 cores
- 166
- °C bottom-hole temperature
SODIR FACTPAGES · RECORD UPDATED NOV 4, 2026 · RELEASED OCT 26, 1993
On file for this wellbore
What the Directorate holds from this wellbore. Each opens the section that lists it.
Drilling
- Drilling facility
- ROSS RIG (2) · Semisub steel
- Drilling days
- 172
- Kelly bushing elevation
- 24 m
- Maximum inclination
- 5.5°
- Drilling permit
- 681-L
- Licensing round
- 11-A
- Plugged and abandoned
- —
- Core samples available
- Yes
- Cuttings samples available
- Yes
- Position · ED50
- 65.05703° N, 6.62289° E
- Hydrocarbons in
- Lange Fm · Late Cretaceous
- Hydrocarbons in
- Ile Fm · Middle Jurassic
- Hydrocarbons in
- Tilje Fm · Early Jurassic
Well history
WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE
General
Well 6506/11-2 was drilled on the southwestern extension of the Smørbukk Field on the Halten Terrace. The exploratory objectives of the well were to prove oil in the Tilje, Ile, and possibly Garn Formations in the southwestern part of the Smørbukk Discovery. The well would also provide essential field development data for this part of the Smørbukk Discovery in connection with the Smørbukk South Field development planning.
Shallow gas warnings were given for seven levels down to 910 m. Maximum pore pressure was expected to ca 1.60 g/cm3 when entering the Late Jurassic reservoir.
Operations and results
Well 6506/11-2 was spudded with the semi-submersible installation Ross Rig on 8 May 1991 and drilled to TD at 4813 m in the Early Jurassic Åre Formation. No shallow gas was encountered. The well was drilled with seawater and hi-vis pills down to 830 m and with gypsum/polymer mud from 830 m to 2307 m. When running the 13 3/8" casing it got stuck. Several Imcospot/Pipelax pills were spotted to free the pipe, but without success, so the hole was plugged back and sidetracked. The sidetrack from 1257 m was drilled with gypsum/polymer mud down to 2255 m, with gypsum/PAC/Kemseal polymer mud from 2255 m to 4238 m, and with bentonite/Thermopol/Ancotemp mud from 4238 m to TD. Planned time budget for the well was 74 days, without testing. The well took 172 days. Significant time was lost due to the stuck 13 3/8" casing with subsequent sidetrack drilling. Problems during DST 1 and P&A phase also contributed significant lost time. However, the main deviation from planned time consumption reflected operational decisions during drilling. Extended logging and coring programs were approved in the course of making hole. The results also lead to confirmation of extended testing.
Maximum pore pressure, 1.71 g/cm3, was seen in the top of the Shetland Group at ca 2400 m. The pore pressure in the Late Jurassic was 1.66 g/cm
Around this wellbore
This wellbore on Sodir FactPages →
About this data
Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.
Developers: this page as JSON is GET /v1/data/norway/wells/1754, documented in the API reference.