NORWAY · WELLBORES · NPDID 1770
30/9-12 A
Exploration · Appraisal · Suspended · Oil · Norsk Hydro Produksjon AS · Oseberg · PL 104
30/9-12 A is an appraisal exploration wellbore in the North Sea, drilled by Norsk Hydro Produksjon AS, entered May 9, 1991, to 3,061 m in the Drake Fm.
Discovery 30/6-1 Oseberg · On the map →
- 3,061
- m total depth · 2,927 m vertical
- 104
- m water depth
- May 9, 1991
- entered · completed Jun 4, 1991
- Drake Fm
- at total depth · Early Jurassic
- 38
- m of core in 6 cores
- 110
- °C bottom-hole temperature
SODIR FACTPAGES · RECORD UPDATED MAR 1, 2026 · RELEASED JUN 4, 1993
On file for this wellbore
What the Directorate holds from this wellbore. Each opens the section that lists it.
Drilling
- Drilling facility
- VILDKAT EXPLORER · Semisub steel
- Drilling days
- 27
- Kelly bushing elevation
- 25 m
- Maximum inclination
- 24.5°
- Drilling permit
- 683-L
- Licensing round
- 9
- Plugged and abandoned
- —
- Core samples available
- Yes
- Cuttings samples available
- Yes
- Position · ED50
- 60.43252° N, 2.85969° E
- Hydrocarbons in
- Intra Heather Fm Ss · Late Jurassic
Well history
WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE
General
Well 30/9-12 A was designed as a sidetrack from well 30/9-12 on the Alpha South structure on the southern extension of the Oseberg Field. Well 30/9-12 proved a 10 m column of oil in the Tarbert Formation, but as no oil/water contact was established there remained uncertainty as to the amount of hydrocarbon resources within the southern part of the Alpha South structure. The objectives of well 30/9-12A were to sidetrack approximately 700 m down dip south-eastwards in order to establish the water pressure and oil/water contact in the Tarbert Formation in the area as well as to verify the structural mapping and geological model of the area. No drilling hazards were anticipated.
Operations and results
Appraisal well 30/9-12 A was with kicked off with the semi-submersible rig Vildkat Explorer on 9 May 1991. Kick-off point was at 1033 m, below the 13 3/8" casing shoe in well 30/9-12. The well bore was drilled to a total depth of 3061 m (2927 m TVD RKB) in the Drake Formation of the Dunlin Group. It was drilled with KCl polymer mud from kick-off to TD.
The well encountered an unexpected Heather Formation sandstone development that proved to be hydrocarbon bearing. A total of 2.63 m net pay sand was calculated, with an average porosity of 23.3% and average water saturation of
31.4%. Sandstones of the Brent Group were penetrated below the regional oil/water contact and were found to be totally water bearing. A total of six conventional cores were cut in this well in the interval 2874 m to 2919 m in the Tarbert and Ness Formations. A total of 30 sidewall cores were attempted and 28 were recovered. Drilling went on without any significant problems to TD. Oil was recovered from RFT samples taken at 2776.3 m and 2776.6 m. Geochemical analyses showed the Heather oil in 30/9-12 A correlate very well with Tarbert oils from 30/9-12 and 30/9-10, indicating a common source and identical maturity.
The well was suspen
Around this wellbore
This wellbore on Sodir FactPages →
About this data
Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.
Developers: this page as JSON is GET /v1/data/norway/wells/1770, documented in the API reference.