2/4-17

Exploration · Wildcat · P&A · Gas/condensate · Phillips Petroleum Company Norway · PL 018

6 documents: reports, logs, and plots →

2/4-17 is a wildcat exploration wellbore in the North Sea, drilled by Phillips Petroleum Company Norway, entered Jul 21, 1991, to 5,258 m in the Rotliegend Gp.

Discovery 2/4-17 Tjalve · On the map →

5,258
m total depth · 5,255 m vertical
68
m water depth
Jul 21, 1991
entered · completed Feb 29, 1992
Rotliegend Gp
at total depth · Early Permian
17.6
ft of core in 1 core
182
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED MAR 1, 2026 · RELEASED MAR 1, 1994

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
MÆRSK GUARDIAN · Jack-up 3 legs
Drilling days
224
Kelly bushing elevation
43 m
Maximum inclination
9.60000038°
Drilling permit
689-L
Licensing round
1-A
Plugged and abandoned
—
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
56.68406° N, 3.22922° E
Hydrocarbons in
Ula Fm · Late Jurassic

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

The Exploration well 2/4-17 was drilled on the NW Tor prospect situated in the Production License 018. The objective was to test the Late Jurassic and Early Permian sections in a rotated fault block on a terrace NW of the Tor Field. The block is situated in the Central Trough, which is part of the failed Mesozoic North Sea, rift system. The Central Trough comprises a complex series of narrow discontinuous highs and lows with a NW-SE trend. The most important basins are the Feda Graben, the Breiflab Basin and the Søgne Basin. From the Feda Graben/Breiflab Basin up to the Sørvestlandet High several rotated fault blocks form platforms and small highs, named the Cod Terrace, the Hitra High and the Steinbit Terrace. The NW Tor Prospect is situated on a Terrace between the Hitra High and the Feda Graben.

Operations and results

Wildcat well was spudded with the 3-leg jack up installation on 29 February 1992 and drilled to TD at 5258 m in the Early Permian Rotliegendes Group. Drilling went without problems to 2081m were the well was sidetracked because the string became stuck while taking a survey. While pulling out of the hole, following the cutting core to a depth of 4357.1 m, an influx of gas occurred and the well was shut in. Following a 22 hours well kill operation, the well was brought back under control. A second technical sidetrack was taken at 4724 m due to a twist-off of the bottom hole assembly. The well was drilled with seawater/gel down to 466 m, with KCl mud from 466 m to 2146 m, with Soltex from 2146 m to 2582 m, with Soltex/Drispac from 2582 m to 4151 m, with HTHP mud from 4151 m to 4724 m, and with High Temp mud from 4724 m to TD

To thin hydrocarbon-bearing intervals were present in the Hod Formation. At 4340 m a major hydrocarbon bearing sand of the Late Jurassic Ula Formation was encountered. At 4520 to 5027 m an excellent quality aeolian dune sand of Early Permian age (Rotliegendes Group) was penetrated. The overa

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/1792, documented in the API reference.