NORWAY · WELLBORES · NPDID 1835
15/12-8 A
Exploration · Appraisal · P&A · Gas/condensate · Den norske stats oljeselskap a.s · PL 038
15/12-8 A is an appraisal exploration wellbore in the North Sea, drilled by Den norske stats oljeselskap a.s, entered Jul 14, 1991, to 2,940 m in the Skagerrak Fm.
Discovery 15/12-8 · On the map →
- 2,940
- m total depth · 2,939 m vertical
- 87
- m water depth
- Jul 14, 1991
- entered · completed Jul 29, 1991
- Skagerrak Fm
- at total depth · Triassic
- 61
- m of core in 3 cores
- 123
- °C bottom-hole temperature
SODIR FACTPAGES · RECORD UPDATED MAR 27, 2026 · RELEASED JUL 29, 1993
On file for this wellbore
What the Directorate holds from this wellbore. Each opens the section that lists it.
Drilling
- Drilling facility
- DEEPSEA BERGEN decom · Semisub steel
- Drilling days
- 16
- Kelly bushing elevation
- 23 m
- Maximum inclination
- 0°
- Drilling permit
- 691-L
- Licensing round
- 3
- Plugged and abandoned
- —
- Core samples available
- Yes
- Cuttings samples available
- Yes
- Position · ED50
- 58.05051° N, 1.96761° E
- Hydrocarbons in
- Vestland Gp · Late Jurassic
- Hydrocarbons in
- Skagerrak Fm · Triassic
Well history
WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE
General
Wildcat well 15/12-8 was drilled ca 3.5 km east of the 15/12-4 well, which made the Varg oil discovery in Jurassic and Triassic sandstones. The main objective of the well was to test the potential for hydrocarbons in sandstones of Oxfordian and Triassic age. Seismic anomalies at 437, 467, 479 and 803 m indicated possibility for shallow gas. Planned TD for the well was 3260 m.
Operations and results
Well 15/12-8 was spudded with the semi-submersible installation Deepsea Bergen on 5 June 1991 and drilled to TD at 3054 m in the Triassic Skagerrak Formation. No significant problems occurred during operations. The well was drilled with seawater / hi-vis pills / CMC down to 615 m, with KCl/polymer mud from 615 m to 2855 m, and with Ancotemp/bentonite mud from 2855 m to TD. No shallow gas was encountered.
Jurassic Vestland Group sandstone was encountered hydrocarbon-bearing at 2838 m. The hydrocarbon column extended 23 m into Triassic sandstone of the Skagerrak Formation. The gas/water contact was estimated to 2877 m, confirmed by FMT pressure gradients and wire line logs. The well was tested, and since no core was cut through the reservoir, the well was sidetracked at 2623 m with TD at 2940 m. The sidetrack was drilled with Ancotemp/bentonite mud. Three conventional cores were cut in the interval 2841 - 2902 m. The sidetrack was formally named 15/12-8 A.
The FMT tool was run in well 15/12-8 and 15/12-8A. One segregated sample was taken at 2863 m in 15/12-8 (gas, condensate and mud filtrate) and another in the water zone at 2888 m in well 15/12-8 A (recovered mud only due to seal failure).
Well 15/12-8 was permanently abandoned on 14 July 1991 as a gas/condensate discovery. The 15/12-8 A sidetrack was permanently abandoned on 29 July as a gas/condensate appraisal well.
Testing
One DST test was performed in 15/12-8 in the interval 2838 - 2869 m. The well produced gas-condensate with a de
Around this wellbore
This wellbore on Sodir FactPages →
About this data
Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.
Developers: this page as JSON is GET /v1/data/norway/wells/1835, documented in the API reference.