NORWAY · WELLBORES · NPDID 1842

34/8-6

Exploration · Wildcat · P&A · Shows · Norsk Hydro Produksjon AS · PL 120

6 documents: reports, logs, and plots →

34/8-6 is a wildcat exploration wellbore in the North Sea, drilled by Norsk Hydro Produksjon AS, entered Sep 21, 1991, to 3,950 m in the Drake Fm.

On the map →

3,950
m total depth · 3,948 m vertical
376
m water depth
Sep 21, 1991
entered · completed Nov 3, 1991
Drake Fm
at total depth · Early Jurassic
12.6
m of core in 1 core
122
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED MAR 1, 2026 · RELEASED NOV 3, 1993

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
TRANSOCEAN 8 · Semisub steel
Drilling days
44
Kelly bushing elevation
23.5 m
Maximum inclination
3.79999995°
Drilling permit
699-L
Licensing round
10-A
Plugged and abandoned
—
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
61.44204° N, 2.47593° E

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

Well 34/8-6 was designed to drill North of the Visund Field on a northerly trending arm of the Tampen Spur. The main structural feature in block 34/8, the A-structure, is a NNE-SSW oriented elongated rotated fault block with pre-Cretaceous strata dipping towards the WNW. The block contains the Visund field, and is divided into two compartments, the A-south and the A-north, by a central fault. The well will test a stratigraphic trap on the northwest flank of the A-structure. From seismic anomalies possible shallow gas was expected at 510 m, 544 m, 556 m, and 877 m. Levels at 544 m, and 556 m are dipping sand layers, and could contain gas with overpressure. Scattered boulders could be expected between 424and 540 m.

The primary objective for well 34/8-6 was to test the presence of a hydrocarbon-bearing sand within the Upper Jurassic Draupne Formation, and was drilled close to the thickest portion of the interpreted turbidite sand. Secondary objectives were to drill through the Brent Group to yield more information about development and thickness control down dip of the structural crest, and to tag top of the Dunlin Group to permit a good seismic tie-in, which can be carried up dip towards the Visund reservoir.

Operations and results

Wildcat well 34/8-6 was spudded with the semi-submersible installation Transocean 8 on 21 September 1991 and at a depth of 3950 m in the Early Jurassic Drake Formation. The well was drilled with spud mud down to 1235 m and with KCl mud from 1235 m to TD. Drilling went on without any significant problems. Shallow gas indications were encountered during drilling of the 8 1/2" pilot hole at 541 m and 550 m, but caused no problems, and no gas was observed at the wellhead during drilling operations. The gas indications did not correspond with any of the predicted sand layers.

There was no sandstone developed at the primary objective in the Draupne Formation. Crude oil appeared in the mu

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/1842, documented in the API reference.