NORWAY · WELLBORES · NPDID 1851

2/1-A-26

Development · Production · P&A · Oil · BP Norway Limited U.A. · Gyda · PL 019 B

2/1-A-26 is a production development wellbore in the North Sea, drilled by BP Norway Limited U.A., entered Aug 3, 1992, to 4,172 m.

Discovery 2/1-3 Gyda · On the map →

4,172
m total depth · 4,075 m vertical
66
m water depth
Aug 3, 1992
entered · completed Sep 12, 1992
—
at total depth
27.1
m of core in 1 core
—
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED SEP 2, 2026 · RELEASED SEP 12, 1994

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
GYDA · Jacket 6 legs
Drilling days
41
Kelly bushing elevation
56 m
Maximum inclination
—°
Drilling permit
732-P
Licensing round
1-A
Plugged and abandoned
Sep 12, 2021
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
56.90479° N, 3.08508° E

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/1851, documented in the API reference.