NORWAY · WELLBORES · NPDID 1867

2/1-9 A

Exploration · Appraisal · P&A · Oil · BP Norway Limited U.A. · Gyda · PL 019 B

5 documents: reports, logs, and plots →

2/1-9 A is an appraisal exploration wellbore in the North Sea, drilled by BP Norway Limited U.A., entered Jan 18, 1992, to 4,379 m in the Ula Fm.

Discovery 2/1-9 Gyda Sør · On the map →

4,379
m total depth · 4,124 m vertical
66
m water depth
Jan 18, 1992
entered · completed Mar 8, 1992
Ula Fm
at total depth · Late Jurassic
178.1
m of core in 6 cores
138
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED NOV 4, 2026 · RELEASED MAR 8, 1994

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
ROSS ISLE · Semisub steel
Drilling days
51
Kelly bushing elevation
23 m
Maximum inclination
60°
Drilling permit
713-L
Licensing round
1-A
Plugged and abandoned
Mar 2, 2014
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
56.86049° N, 3.08466° E
Hydrocarbons in
Ula Fm · Late Jurassic

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

Well 2/1 ?9 A was drilled to appraise the 2/1-9 discovery in the Late Jurassic "Gyda sandstone member" (Ula Formation), by side-tracking up-dip to the crest of the Gyda South structure. If successful, the well could at a later stage be completed as a producer and tie back to Gyda platform. The structure is a fault/dip closure, which lies in the Late Jurassic fairway on the eastern flank of the Central Graben, 6 kilometres south of the Gyda field in the North Sea.

Operations and results

Well 2/1-9 was re-entered on 18 January 1992 by the semi submersible installation Ross Isle. The appraisal sidetrack well 2/1-9 A was kicked off in the 8 1/2" hole from 3270 m in the Late Cretaceous Tor Formation and drilled to TD 4379 m in the Late Jurassic Ula Formation. It took 25 1/2 days (18 1/2 days longer than planned) to drill to coring point at 4140 m. This delay was mainly due to difficulties in controlling the directional tendencies of the BHA's, which required a number of correction runs. In addition, poor bit performance and harder than expected formations exacerbated the slow progress. Hole inclination was 52.8 degrees at coring point. Problems were also experienced during TD logging with stuck logging tools and stuck pipe whilst attempting to retrieve the tool. In addition a 9 bbl influx had to be circulated out during this time. The well was drilled with Novamul ether-based mud from kick-off to TD.

The target Ula Formation sandstone was encountered at 4099 m (3966 m TVD RKB). It was 120 m thick (TVD) and oil-bearing all through. The logs observed no OWC.

Six cores (178 m) were cut in the 8 1/2" hole. All cores had 100% recovery with excellent shows being observed throughout. Core 1 to 5 covered the sandstone of the Ula Formation while core 6 entered into a mud stone member at the base. No H2S was observed whilst coring -despite having high level contingency due to H2S seen on well 2/1-9. The RFT wa

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.