NORWAY · WELLBORES · NPDID 1878

2/7-27 S

Exploration · Appraisal · Re-class to dev · Oil · Phillips Petroleum Company Norway · Embla · PL 018

10 documents: reports, logs, and plots →

2/7-27 S is an appraisal exploration wellbore in the North Sea, drilled by Phillips Petroleum Company Norway, entered Nov 9, 1991, to 4,801 m in the No Group Defined.

Discovery 2/7-20 Embla · On the map →

4,801
m total depth · 4,452 m vertical
71
m water depth
Nov 9, 1991
entered · completed Jun 17, 1992
No Group Defined
at total depth · Devonian
36.1
ft of core in 4 cores
168
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED MAR 1, 2026 · RELEASED JUN 17, 1994

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
WEST DELTA · Semisub steel
Drilling days
222
Kelly bushing elevation
29 m
Maximum inclination
41.79999924°
Drilling permit
707-L
Licensing round
1-A
Plugged and abandoned
—
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
56.33328° N, 3.24827° E
Hydrocarbons in
No Group Defined · Devonian

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

Well 2/7-27 S was drilled on the Embla structure in the southern North Sea. The objective was to drill to replace the abandoned 2/7-23 S well as a production well in the Embla reservoir. Well 2/7-27 S would thus be drilled as close as possible to the 2/7-23 S well path and to the same bottom hole location. By this it was anticipated that the extensive core data recovered in the 2/7-23 S would be applicable to the production data to be gained from the 2/7-27 S. The 2/7-23 S had earlier confirmed the presence of hydrocarbon bearing sandstones originally discovered in the 2/7-9 (1974), and later tested in the 2/7-20 (1988) and 2/7-21 S (1989) wells, but was abandoned before well testing could be performed.

Operations and results

Appraisal well 2/7-27 S was spudded with the semi-submersible installation West Delta on 9 November 1991 and drilled to TD at 4801 m (4452 m TVD) in pre-Jurassic rocks. It was drilled deviated from a fifteen slot production template located at the site of the planned Embla production facilities. Drilling problems with stuck pipe were encountered in the 12 1/4" hole section at 3470 m, forcing a technical sidetrack from 2972.7 m. Unlike previous Embla wells, the 2/7-27S was drilled using water based mud throughout. It was drilled with seawater and hi-vis pills down to 573 m, with KCl/polymer mud from 573 m to 3791 m, with Baranex-Thermathin mud from 3791 m to 4500 m, and with a Thermadrill/Baranex high temperature mud system from 4500 m to TD.

The 2/7-27 S well encountered top Mandal Formation at 4476 m and top pre-Jurassic reservoir at 4483.3 m (4177.6 m TVD) with the same reservoir stratigraphy as the 2/7-23S. However, although the wells are only 46.5 m apart at the Base Cretaceous Unconformity, th

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.