NORWAY · WELLBORES · NPDID 197

15/6-1

Exploration · Wildcat · P&A · Dry · Esso Exploration and Production Norway A/S · PL 029

3 documents: reports, logs, and plots →

15/6-1 is a wildcat exploration wellbore in the North Sea, drilled by Esso Exploration and Production Norway A/S, entered Aug 7, 1971, to 1,679 m in the Hordaland Gp.

On the map →

1,679
m total depth · 1,616 m vertical
115.5
m water depth
Aug 7, 1971
entered · completed Sep 8, 1971
Hordaland Gp
at total depth · Eocene
—
m of core
41
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED FEB 20, 2026 · RELEASED SEP 8, 1973

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
GLOMAR GRAND ISLE · Vessel
Drilling days
33
Kelly bushing elevation
9 m
Maximum inclination
0°
Drilling permit
60-L
Licensing round
2-A
Plugged and abandoned
—
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
58.54674° N, 1.69244° E

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

Well 15/6-1 is located ca 5 km north of the Sleipner Field. The primary objective of the well was Eocene sands.

Operations and results

Well 15/6-1 was spudded with the drill vessel Glomar Grand Isle on 7 August 1971and drilled to TD at 1679 m in Eocene sediments of the Hordaland Group. Initial drilling from the sea floor to 384 m was with sea water and gel. Below 384 m to a depth of 1247 m the mud system consisted of sea water and Spersene XP-20 Salinex with drilling detergent. From 1247 m to TD a fresh water Spersene XP-20 system was used. Due to problems with the casing seal assembly the well was abandoned without reaching its target. The vessel vas moved approximately 335 m east and a replacement hole (15/6-2) was drilled.

The only reservoir penetrated was a thick Miocene sand section (the Utsira Formation) between 768 and 996 m. No hydrocarbon shows were encountered.

No cores were cut and no wire line fluid samples were taken.

The well was permanently abandoned on 8 September 1971 as a junk well.

Testing

No drill stem test was performed.

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/197, documented in the API reference.