NORWAY · WELLBORES · NPDID 2015

30/10-7

Exploration · Wildcat · P&A · Dry · Elf Petroleum Norge AS · PL 142

5 documents: reports, logs, and plots →

30/10-7 is a wildcat exploration wellbore in the North Sea, drilled by Elf Petroleum Norge AS, entered Sep 8, 1992, to 2,612 m in the Hardråde Fm.

On the map →

2,612
m total depth · 2,611.1 m vertical
106
m water depth
Sep 8, 1992
entered · completed Oct 17, 1992
Hardråde Fm
at total depth · Late Cretaceous
18.4
m of core in 2 cores
75
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED MAR 1, 2026 · RELEASED OCT 17, 1994

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
MÆRSK JUTLANDER · Semisub steel
Drilling days
40
Kelly bushing elevation
23 m
Maximum inclination
4°
Drilling permit
742-L
Licensing round
11-B
Plugged and abandoned
—
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
60.19115° N, 2.12424° E

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

The exploration well 30/10-7 was dedicated to explore the hydrocarbon potential of the Paleocene Hermod Formation.

Well 30/10-7 is located in the central-northern part of block 30/10, and the Paleocene structure forms a moundy/domal feature, with minor normal faults to the east and west of the well location. TD was planned at 2613 m in the Late Cretaceous Hardråde Formation.

Operations and results

The well 30/10-7 was spudded 8 September by the semi-submersible installation Maersk Jutlander and drilled to TD at 2612 m in the Late Cretaceous Hardråde Formation. The well was drilled with seawater and hi-vis pills down to 1270 m and with Gyp / Polymer mud from 1270 m to TD. The well encountered sands with very good reservoir characteristics both in the Hermod Formation and in the Heimdal Formation, but the reservoirs were water bearing. In the entire well bore no shows of any kind was observed. Two cores were cut from 2207 m to 2227 m and recovered sands and mudstone from the Hermod and Sele Formations. No fluid samples were taken.

The well was permanently abandoned on 17 October 1992 as a dry hole.

Testing

No drill stem test was performed

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/2015, documented in the API reference.