30/9-B-18 A

Development · Production · Plugged · Oil · Norsk Hydro Produksjon AS · Oseberg · PL 079

30/9-B-18 A is a production development wellbore in the North Sea, drilled by Norsk Hydro Produksjon AS, entered Sep 27, 1992, to 4,982 m in the Ness Fm.

Discovery 30/6-1 Oseberg · On the map →

4,982
m total depth · 2,761 m vertical
109
m water depth
Sep 27, 1992
entered · completed Oct 23, 1992
Ness Fm
at total depth · Middle Jurassic
—
m of core
106
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED SEP 2, 2026 · RELEASED OCT 23, 1994

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
OSEBERG B · Jacket 8 legs
Drilling days
27
Kelly bushing elevation
58 m
Maximum inclination
93.40000153°
Drilling permit
741-P
Licensing round
Awarded additionally to round 6
Plugged and abandoned
Oct 14, 2016
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
60.49342° N, 2.82867° E
Hydrocarbons in
Oseberg Fm · Middle Jurassic

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

Well 30/9-B-18 A is a production side-track from observation well 30/9-B-18 on the 30/9-1 Oseberg Discovery in the North Sea. The main objective for Well 30/9-B-18A was oil production from a planned 1200 metres horizontal section in the Oseberg, Etive and Lower Ness Formations.

The NSO-1 geochemical standard oil was produced from 30/9-B-18 A.

Operations and results

Development well 30/9-B-18 A was kicked off at 3344 m in well 30/9-B-18 on 26 September 1992. It was drilled from the Oseberg B platform to TD at 4982 m (2761 m TVD) m in the Middle Jurassic Ness Formation. The target of the well was on the Oseberg Alpha Structure approximately 3 km south-east of the Oseberg B platform. It was drilled horizontally (between 88 and 93 deviation) from ca 3850 m in the Oseberg Formation To TD at 4982 m in the Ness Formation. The well was drilled with oil based Safemul mud from kick-off to TD.

Total drilled length of Oseberg, Etive and Lower Ness in the horizontal well is ca 1130 m, in line with the prognosed 1200 metres.

No cores were cut in this well. No wireline pressures were taken, and no wireline fluid sample was taken.

The well was completed as a producer on 8 December 1992.

Testing

The well was completed with 15 perforation intervals between 3831 m and 4912 m (2762.2 m TVD and 2759.5 m TVD) in the horizontal sections in the lower Ness and Oseberg-Rannoch-Etive (ORE) formations. Production testing measured flow rat

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/2016, documented in the API reference.