NORWAY · WELLBORES · NPDID 204

34/10-12

Exploration · Wildcat · P&A · Dry · Den norske stats oljeselskap a.s · PL 050

11 documents: reports, logs, and plots →

34/10-12 is a wildcat exploration wellbore in the North Sea, drilled by Den norske stats oljeselskap a.s, entered Jul 16, 1981, to 2,800 m in the Statfjord Gp.

On the map →

2,800
m total depth · 2,798 m vertical
138
m water depth
Jul 16, 1981
entered · completed Sep 12, 1981
Statfjord Gp
at total depth · Early Jurassic
4
m of core in 1 core
75
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED MAR 1, 2026 · RELEASED SEP 12, 1983

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
NORDRAUG · Semisub steel
Drilling days
59
Kelly bushing elevation
25 m
Maximum inclination
6.19999981°
Drilling permit
295-L
Licensing round
Awarded additionally to round 3
Plugged and abandoned
—
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
61.15741° N, 2.10603° E

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

Well 34/10-12 was drilled on Tampen Spur in the North Sea close to the western side of the Gullfaks Fault Block. The primary objective of the well was to test sandstones of Middle Jurassic age. Secondary objectives were sandstones of Early Jurassic age.

Operations and results

Wildcat well 34/10-12 was spudded with the semi-submersible installation Neptuno Nordraug on 16 July 1981 and drilled to TD at 2800 m in the Early Jurassic Statfjord Group. The well was drilled with seawater and prehydrated Gel pills down to 298 m and with gel/lignosulphonate mud from 298 m to TD.

The sandstones of both Middle and Early Jurassic age were water saturated. Shows were recorded on cuttings from claystones, limestone and occasional thin sandstones from 1260 m in the Hordaland Group to 1657 m in the Balder Formation. The Jurassic had only trace fluorescence in sandstone cuttings at 2094 to 2110 m in the Ness Formation, otherwise no trace of hydrocarbons were seen.

One core was cut from 2037 m to 2042.7 m in the Ness Formation. No wire line fluid samples were taken.

The well was permanently abandoned on 12 September as a dry well.

Testing

No drill stem test was performed.

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/204, documented in the API reference.