NORWAY · WELLBORES · NPDID 2047

2/1-A-14

Development · Production · Plugged · Dry · BP Norway Limited U.A. · Gyda · PL 019 B

2/1-A-14 is a production development wellbore in the North Sea, drilled by BP Norway Limited U.A., entered Nov 16, 1992, to 4,130 m.

Discovery 2/1-3 Gyda · On the map →

4,130
m total depth · 3,943 m vertical
66
m water depth
Nov 16, 1992
entered · completed Dec 19, 1992
—
at total depth
—
m of core
—
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED SEP 2, 2026 · RELEASED DEC 19, 1994

On file for this wellbore

Nothing yet. The Directorate has no tops, samples, logs, or documents on file for this wellbore; material from a new well is released two years after completion.

Drilling

Drilling facility
GYDA · Jacket 6 legs
Drilling days
34
Kelly bushing elevation
56 m
Maximum inclination
—°
Drilling permit
756-P
Licensing round
1-A
Plugged and abandoned
Mar 19, 1996
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
56.90484° N, 3.08517° E

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/2047, documented in the API reference.