NORWAY · WELLBORES · NPDID 2076
30/9-14
Exploration · Appraisal · P&A · Oil/gas · Norsk Hydro Produksjon AS · Oseberg Sør · PL 104
30/9-14 is an appraisal exploration wellbore in the North Sea, drilled by Norsk Hydro Produksjon AS, entered Mar 16, 1993, to 3,680 m in the Drake Fm.
Discovery 30/9-13 S Oseberg Sør · On the map →
- 3,680
- m total depth · 3,678 m vertical
- 107
- m water depth
- Mar 16, 1993
- entered · completed May 14, 1993
- Drake Fm
- at total depth · Early Jurassic
- 308.4
- m of core in 11 cores
- 135
- °C bottom-hole temperature
SODIR FACTPAGES · RECORD UPDATED NOV 4, 2026 · RELEASED MAY 14, 1995
On file for this wellbore
What the Directorate holds from this wellbore. Each opens the section that lists it.
Drilling
- Drilling facility
- POLAR PIONEER · Semisub steel
- Drilling days
- 60
- Kelly bushing elevation
- 23 m
- Maximum inclination
- 8.39999962°
- Drilling permit
- 756-L
- Licensing round
- 9
- Plugged and abandoned
- —
- Core samples available
- Yes
- Cuttings samples available
- Yes
- Position · ED50
- 60.38642° N, 2.70538° E
- Hydrocarbons in
- Intra Heather Fm Ss · Late Jurassic
- Hydrocarbons in
- Tarbert Fm · Middle Jurassic
Well history
WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE
General
Well 30/9-14 is located in the western part of block 30/9, on the Southern Oseberg complex. The primary objectives of the well were to appraise oil within the G-North prospect and verify the potential resources of the G-North and G-West prospect, leaving a minimum of untested resources up dip of the well on the G-North prospect; to define fluid contacts, primarily the OWC in the Tarbert Formation; and to verify the structural mapping, depth conversion and the geological model for the G-North area. Secondary objectives were to verify the lateral extent of the lower Heather sand, to test a possible hydrocarbon potential within the Ness and ORE (Oseberg/Rannoch/Etive) Formations, and to obtain a good well tie of the base Brent reflector and the intra Dunlin reflector.
Operations and results
Appraisal well 30/9-14 was spudded with the semi-submersible installation "Polar Pioneer" on 16 March 1993 and drilled to total depth at 3680 m in the Early Jurassic Drake Formation. The well was drilled water based with sea water and hi-vis pills in the 36", 24", and 17 1/2" sections, down to 1040 m, and with a KCl / PHPA / Polymer mud from 104 m to TD. Sedimentological and lithological development was similar to 30/9-13 S, but approximately 250 m of Early Oligocene sand encountered in well 30/9-13 S was not present in well 30/9-14 where the same interval is dominated by clay stone. The Viking Group came in at 2967 m and the Top Tarbert Formation came in at 3059.5 m, 84 m deeper than prognosis due to too low velocities in the Tertiary section. Sixty-six m of Intra Heather Sandstone was verified from 2993.5 m to 3059.5 m. Poor to moderate shows were observed in the Draupne and Heather Formations from 2968.5 m to 3059.5 m. Moderate to good shows were seen from 3059.6 m to 3130 m in the Tarbert Formation. Good shows (residual oil) were also observed in the ORE Formation from 3503 - 3514 m. The Lower Heather and upper Tarbert Formations were proven to
Around this wellbore
This wellbore on Sodir FactPages →
About this data
Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.
Developers: this page as JSON is GET /v1/data/norway/wells/2076, documented in the API reference.