34/8-8 R is an appraisal exploration wellbore in the North Sea, drilled by Norsk Hydro Produksjon AS, entered Feb 16, 1993, to 3,624 m in the Lunde Fm.

Discovery 34/8-1 Visund · On the map →

3,624
m total depth · 3,622 m vertical
340.5
m water depth
Feb 16, 1993
entered · completed Mar 9, 1993
Lunde Fm
at total depth · Late Triassic
—
m of core
130
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED NOV 4, 2026 · RELEASED MAR 9, 1995

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
POLAR PIONEER · Semisub steel
Drilling days
22
Kelly bushing elevation
23 m
Maximum inclination
6.5°
Drilling permit
730-L2
Licensing round
10-A
Plugged and abandoned
Mar 9, 1993
Core samples available
No
Cuttings samples available
No
Position · ED50
61.37950° N, 2.47884° E
Hydrocarbons in
Brent Gp · Middle Jurassic

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

Well 34/8-8 R is a re-entry of appraisal well 34/8-8 on the N-1 segment of the 34/8-1 Visund discovery on Tampen Spur in the Northern North Sea. The primary objective of well 34/8-8R was to determine the pressure regime and pressure gradient in the hydrocarbon bearing sands in Tarbert, Ness and Etive formations. The secondary objective was to determine the fluid system/composition and the possible presence of a gas oil contact in the Tarbert/Ness formations. The third objective was to investigate the mobility of oil and water down to the interpreted free water level (FWL)

Operations and results

Well 34/8-8 was re-entered on 16 February 1993 with the semi-submersible installation Polar Pioneer.

The well was drill stem tested. No significant problems occurred in the operations.

No cores were cut and no wire line fluid samples were taken.

The well was permanently abandoned on 9 March 1993 as an oil appraisal.

Testing

Two drill stem tests were performed. In both tests production logging (PLT) was performed during the main flow.

DST 1 tested the interval 2960.2 to 2973.2 m in the Ness/Etive formations. The test sequence consisted of an initial and a cleanup flow/build-up period with down hole shut-in. The main flow with PLT was interrupted by poor weather conditions and the well was immediately killed. Only a limited amount of the surface sampling program was therefore accomplished. No down hole sam

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.