NORWAY · WELLBORES · NPDID 2120

2/7-D-26

Development · Production · Closed · Oil · Phillips Petroleum Company Norway · Embla · PL 018

2/7-D-26 is a production development wellbore in the North Sea, drilled by Phillips Petroleum Company Norway, entered Mar 20, 1991, to 4,870 m.

Discovery 2/7-20 Embla · On the map →

4,870
m total depth · 4,718 m vertical
70.8
m water depth
Mar 20, 1991
entered · completed Sep 13, 1991
—
at total depth
—
m of core
—
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED OCT 27, 2026 · RELEASED SEP 13, 1993

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
MÆRSK GUARDIAN · Jack-up 3 legs
Drilling days
178
Kelly bushing elevation
51 m
Maximum inclination
—°
Drilling permit
799-P
Licensing round
1-A
Plugged and abandoned
—
Core samples available
No
Cuttings samples available
No
Position · ED50
56.33322° N, 3.24826° E

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/2120, documented in the API reference.