NORWAY · WELLBORES · NPDID 2126

2/4-D-15 A

Development · Production · P&A · Gas · Phillips Petroleum Company Norway · Vest Ekofisk · PL 018

2/4-D-15 A is a production development wellbore in the North Sea, drilled by Phillips Petroleum Company Norway, entered Apr 26, 1993, to 3,477 m.

Discovery 2/4-6 Vest Ekofisk · On the map →

3,477
m total depth · 3,382 m vertical
71
m water depth
Apr 26, 1993
entered · completed May 21, 1993
—
at total depth
51.2
ft of core in 6 cores
—
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED SEP 2, 2026 · RELEASED MAY 21, 1995

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
VEST EKOFISK · Jacket 8 legs
Drilling days
26
Kelly bushing elevation
34 m
Maximum inclination
—°
Drilling permit
794-P
Licensing round
1-A
Plugged and abandoned
Nov 19, 2002
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
56.56307° N, 3.08560° E

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/2126, documented in the API reference.