NORWAY · WELLBORES · NPDID 2213

2/4-B-21 A

Development · Production · P&A · Oil · Phillips Petroleum Company Norway · Ekofisk · PL 018

2/4-B-21 A is a production development wellbore in the North Sea, drilled by Phillips Petroleum Company Norway, entered Nov 30, 1993, to 3,591 m.

Discovery 2/4-2 Ekofisk · On the map →

3,591
m total depth · 3,326 m vertical
71
m water depth
Nov 30, 1993
entered · completed Jan 2, 1994
—
at total depth
—
m of core
—
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED SEP 2, 2026 · RELEASED JAN 2, 1996

On file for this wellbore

Nothing yet. The Directorate has no tops, samples, logs, or documents on file for this wellbore; material from a new well is released two years after completion.

Drilling

Drilling facility
EKOFISK B · Jacket 12 legs
Drilling days
34
Kelly bushing elevation
33 m
Maximum inclination
—°
Drilling permit
853-P
Licensing round
1-A
Plugged and abandoned
Jun 3, 2005
Core samples available
No
Cuttings samples available
No
Position · ED50
56.56525° N, 3.20374° E

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/2213, documented in the API reference.