3/4-1 is a wildcat exploration wellbore in the North Sea, drilled by Amoco Norway Oil Company, entered Jan 11, 1994, to 3,107 m in the Zechstein Gp.

On the map →

3,107
m total depth · 3,107 m vertical
48
m water depth
Jan 11, 1994
entered · completed Feb 26, 1994
Zechstein Gp
at total depth · Late Permian
18.1
m of core in 1 core
107
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED MAR 1, 2026 · RELEASED FEB 26, 1996

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
MÆRSK GALLANT · Jack-up 3 legs
Drilling days
47
Kelly bushing elevation
43.9 m
Maximum inclination
1.29999995°
Drilling permit
781-L
Licensing round
1-A
Plugged and abandoned
—
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
56.68154° N, 4.26086° E

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

Well 3/4-1 was the first well drilled in block 3/4 and was designed to penetrate and evaluate all potential hydrocarbon bearing formations above the Permian Zechstein Salt. The trap that was evaluated is a four way structural closure defined at Base Cretaceous level, formed by salt induced basin inversion, producing the present anticlinal configuration. The structure was identified using 2D seismic data in 1992, but, at that time, the structural configuration of the prospect and the composition of the clastic package could not be defined. Further geophysical, geological and geochemical studies were undertaken to better define the structure and Well 3/4-1 was drilled to help define the nature of the clastic package found in this part of block 3/4.

The primary reservoir objective was the Upper Jurassic, shallow marine sandstone deposits contained in the hanging wall clastic package of the Coffee Soil Fault. Middle Jurassic sandstones were regarded as secondary objectives.

Operations and results

Exploration well 3/4-1 was spudded with the jack-up installation Maersk Gallant on 11 January 1994 and drilled to TD at 3107 m, 18 m into the Permian Zechstein Salt Group. The well was drilled with seawater and bentonite sweeps down to 506 m and with "ANCO 2000" (ca 3% "ANCO 208" glycol additive) from 506 m to TD.

The top of the Hordaland at 1103 m and top of the Rogaland at 2317 m were 17 m shallow and 16 m deep respectively, in relationship to prognosed tops. The top of the Chalk (Shetland Group) 2415 m was 10 m shallower than prognosed, and was 252.5 m thick, 52.5 m thicker than prognosed. No hydrocarbon bearing intervals were found in the Chalk section as had been anticipated. A total of 295 m of Jurassic section was penetrated, versus a prognosed 450m, with 184m of reservoir quality sandstones (versus a prognosed 80m). The Upper Jurassic Ula Sandstone was 184 m thick, 104 m thicker than prognosed, and was dominantly clean sand. There were no free

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.