NORWAY · WELLBORES · NPDID 223

1/3-5

Exploration · Wildcat · P&A · Dry · A/S Norske Shell · PL 011

6 documents: reports, logs, and plots →

1/3-5 is a wildcat exploration wellbore in the North Sea, drilled by A/S Norske Shell, entered Oct 1, 1984, to 4,850 m in the Rotliegend Gp.

On the map →

4,850
m total depth · 4,850 m vertical
71
m water depth
Oct 1, 1984
entered · completed Feb 11, 1985
Rotliegend Gp
at total depth · Early Permian
9
m of core in 1 core
172
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED FEB 20, 2026 · RELEASED FEB 11, 1987

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
NEDDRILL TRIGON · Jack-up 3 legs
Drilling days
134
Kelly bushing elevation
35 m
Maximum inclination
0°
Drilling permit
435-L
Licensing round
1-A
Plugged and abandoned
—
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
56.77112° N, 2.89412° E

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

Well 1/3-5 was drilled on a NW-SE oriented fault block tilted towards the NW. The structure is located in the northern Permian basin, on the east side of Central Graben, extending into blocks 116, 211, and 2/4. The purpose of the well was to evaluate the hydrocarbon potential of the Rotliegendes Group sandstones.

Operations and results

Wildcat well 1/3-5 was spudded with the 3-leg jack up installation Neddrill Trigon on 1 October 1984 and drilled to TD at 4850 m in the Permian Rotliegendes Group. After setting the 30" conductor a 14 3/4" pilot hole was drilled to 1195 m, before opening the hole to 26". Drilling to 2470 m the mud weight was raised from 1.33 g/cm3 to 1.70 g/cm3 due to high formation pressure. This resulted in tight hole during wiper trips, and high weight strain on the drill string, and also caused the 13 3/8" casing to be set somewhat higher than prognosed. Through the chalk sequence the hole seemed to be tight, and while tripping at 3523 m, the drill string got stuck with the bit at 3515 m. It was assumed that the tight interval was caused by one of the stabilizers between 3247 and 3267 m. The string was freed by pumping acid. A high pressure sand sequence in the interval 4363-4395 m, with pore pressure close to the last leak-off Test, resulted in the 7" liner being set 520 m higher than prognosed. The well was drilled with spud mud down to 1195 m, with KCl/polymer mud from 1195 m to 3000 m, from 3000 m the mud was lightly treated with lignosulphonate. Fifty bbl of pipelax with a mud/diesel ratio of 1:1 was added to the mud to free the stuck pipe at 3515 m. From 4122 m to TD the well was drilled with a polymer/sulphonated resin mud.

Traces of yellow direct fluorescence, mainly on fractures, with a moderate milky-white cut fluorescence were observed at the top of the Tor Formation and at several levels deeper down in the formation. Also near the base of the Hod Formation, a very weak

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.