NORWAY · WELLBORES · NPDID 2248

30/12-1

Exploration · Wildcat · P&A · Dry · Norsk Hydro Produksjon AS · PL 171

5 documents: reports, logs, and plots →

30/12-1 is a wildcat exploration wellbore in the North Sea, drilled by Norsk Hydro Produksjon AS, entered Jan 6, 1994, to 3,641 m in the Statfjord Gp.

On the map →

3,641
m total depth · 3,640.5 m vertical
113
m water depth
Jan 6, 1994
entered · completed Mar 7, 1994
Statfjord Gp
at total depth · Early Jurassic
64.7
m of core in 3 cores
150
°C bottom-hole temperature

SODIR FACTPAGES · RECORD UPDATED MAR 1, 2026 · RELEASED MAR 7, 1996

On file for this wellbore

What the Directorate holds from this wellbore. Each opens the section that lists it.

Drilling

Drilling facility
WEST VANGUARD · Semisub steel
Drilling days
61
Kelly bushing elevation
22 m
Maximum inclination
4.5999999°
Drilling permit
774-L
Licensing round
13
Plugged and abandoned
—
Core samples available
Yes
Cuttings samples available
Yes
Position · ED50
60.14564° N, 2.85182° E

Well history

WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE

General

Well 30/12-1 is located ca 12 km south of the 30/9-16 discovery well on the Oseberg Field complex. It was drilled to reduce uncertainties about hydrocarbon migration in the eastern part of the block. The primary objectives of the well were to test the hydrocarbon potential of the Middle Jurassic Tarbert Formation with the Ness-Oseberg-Rannoch-Etive Formations and the Early Jurassic Cook and Statfjord Formations.

Operations and results

Exploration well 30/12-1 was spudded with the semi-submersible installation "West Vanguard" on 6 January 1994 and drilled to TD at 3641 m in the Early Jurassic Statfjord Formation. The well was drilled with seawater and bentonite hi-vis sweeps down to 1130 m and with "ANCO 2000" mud from 1130 m to TD.

The Tarbert Formation was penetrated at 2903 m and was found to be 86 m thick in this well. The Brent Group, the Cook Formation, and the Statfjord Formation were found to be water bearing. Three conventional cores with 65 to 99 % recovery were cut in sandstone with thin coal beds in the interval 2901 m to 2970 m. Core number 1 included the lowermost two metres of the Heather Formation, otherwise all cores were cut in the Tarbert Formation. No fluid samples were taken. The well was permanently abandoned as a dry well on 7 March 1994.

Testing

No drill stem test was performed.

Around this wellbore

This wellbore on Sodir FactPages →

About this data

Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.

Developers: this page as JSON is GET /v1/data/norway/wells/2248, documented in the API reference.