NORWAY · WELLBORES · NPDID 2358
25/11-18
Exploration · Appraisal · P&A · Oil · Norsk Hydro Produksjon AS · Grane · PL 169
25/11-18 is an appraisal exploration wellbore in the North Sea, drilled by Norsk Hydro Produksjon AS, entered Aug 10, 1994, to 1,875 m in the Hod Fm.
Discovery 25/11-15 Grane · On the map →
- 1,875
- m total depth · 1,874 m vertical
- 128
- m water depth
- Aug 10, 1994
- entered · completed Oct 24, 1994
- Hod Fm
- at total depth · Late Cretaceous
- —
- m of core
- 77
- °C bottom-hole temperature
SODIR FACTPAGES · RECORD UPDATED NOV 4, 2026 · RELEASED OCT 24, 1996
On file for this wellbore
What the Directorate holds from this wellbore. Each opens the section that lists it.
Drilling
- Drilling facility
- WEST VANGUARD · Semisub steel
- Drilling days
- 76
- Kelly bushing elevation
- 22 m
- Maximum inclination
- 9.30000019°
- Drilling permit
- 794-L
- Licensing round
- 13
- Plugged and abandoned
- —
- Core samples available
- Yes
- Cuttings samples available
- Yes
- Position · ED50
- 59.15235° N, 2.47466° E
- Hydrocarbons in
- Heimdal Fm · Paleocene
Well history
WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE
General
Well 25/11 -18 was drilled to appraise the 25/11-15 Grane discovery drilled in 1991. The primary objectives of 25/11-18 were to confirm beyond reasonable doubt recoverable oil reserves greater than 30 million Sm3 in the Heimdal Formation in the Grane Discovery prior to initiating PDO activities; to obtain an Utsira formation water sample and water production rates in order to design the water injection system for the Grane Field; to confirm top and base reservoir, reservoir development, continuity, and quality of Heimdal sand in order to reduce the uncertainties in the resource estimates; to obtain velocity information as input to depth conversion model for the Grane Field; and to test coiled tubing drilling/coring technology as concept for future cost savings.
Operations and results
Appraisal well 25/11-18 was spudded with the semi-submersible installation "West Vanguard" on 10 August 1994 and drill to a total depth of 1875 m in the Late Cretaceous limestones of the Hod Formation. Due to technical problems it was not possible to do wire line logging at TD of the original well. The well was technically sidetracked (25/11-18 T2) with kick-off at 1390 m. The well was drilled with spud mud through the 36" and 24" sections down to 563 m, with polymer mud through the 17 1/2" section to 1183 m, with "ANCO 2000" mud from 1183 through the 8 1/2" section and into the slim 4 1/8" section down to 1690 m where the hole was displaced to "AQUACOL" mud.& Drilling of the 4 1/8" section continued with "AQUACOL" mud down to TD at 1860 m. The technical sidetrack was drilled as a 6" hole to final TD at 1875 m using KCl / Polymer mud. Coiled tubing drilling and coring and slim hole logging was proven possible from an offshore floater with acceptable quality on geological information. Operations, however, were hampered by problems related to junk and hole instability due to low mud
Around this wellbore
This wellbore on Sodir FactPages →
About this data
Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.
Developers: this page as JSON is GET /v1/data/norway/wells/2358, documented in the API reference.