NORWAY · WELLBORES · NPDID 247
1/9-4
Exploration · Wildcat · Suspended · Gas/condensate · Den norske stats oljeselskap a.s · Tommeliten Gamma · PL 044
1/9-4 is a wildcat exploration wellbore in the North Sea, drilled by Den norske stats oljeselskap a.s, entered Aug 13, 1977, to 3,710 m in the Zechstein Gp.
Discovery 1/9-4 Tommeliten Gamma · On the map →
- 3,710
- m total depth
- 75
- m water depth
- Aug 13, 1977
- entered · completed Jan 12, 1978
- Zechstein Gp
- at total depth · Late Permian
- 149.6
- m of core in 9 cores
- 150
- °C bottom-hole temperature
SODIR FACTPAGES · RECORD UPDATED NOV 4, 2026 · RELEASED JAN 12, 1980
On file for this wellbore
What the Directorate holds from this wellbore. Each opens the section that lists it.
Drilling
- Drilling facility
- ROSS RIG (1) · Semisub steel
- Drilling days
- 153
- Kelly bushing elevation
- 25 m
- Maximum inclination
- 7.5°
- Drilling permit
- 182-L
- Licensing round
- 3
- Plugged and abandoned
- —
- Core samples available
- Yes
- Cuttings samples available
- Yes
- Position · ED50
- 56.48438° N, 2.93341° E
- Hydrocarbons in
- Ekofisk Fm · Paleocene
- Hydrocarbons in
- Tor Fm · Late Cretaceous
Well history
WRITTEN BY THE NORWEGIAN OFFSHORE DIRECTORATE
General
Well 1/9-4 was drilled on a salt diapir structure in the Central Graben in the neighbourhood of the Norwegian - UK median line. The primary purpose was to test the Ekofisk and Tor formations of Danian and Maastrichtian age. Lower possible porous zones in chalk and Jurassic sands, if present, were secondary objectives.
Operations and results
Wildcat well 1/9-4 was spudded with the semi-submersible installation Ross Rig on 13 August 1977 and drilled to TD at 3710 m in Late Permian Zechstein salt. There were no serious drilling problems down to a depth of 3100 m. At 3100 m the bit-junksub assembly was lost in the hole. The hole was cemented back and sidetracked after the fishing attempts proved unsuccessful. After one unsuccessful sidetrack attempt the hole was sidetracked again from 3041 m and drilled on to core point at 3122 m. When cutting core no 10 the bottom hole assembly got stuck and a long section of the BHA had to be left in the hole. After some unsuccessful attempts on jarring, the hole was cemented and sidetracked again, from 3059 m in the first sidetrack hole. This second sidetracked hole was drilled to a measured depth of 3353 m. At this point 7" liner was run. 6" hole was drilled to a total measured depth of 3710 m with only minor problems and top of the salt was found at 3650 m. The 6" hole was logged and plugged back. It was found necessary to perform a squeeze job around the 7" liner shoe, but when attempting to pull out after this operation, the BHA stuck just above the cementing stinger. Jarring did not free the pipe, and a cement plug was set above the fish. The well was drilled with high viscosity spud mud of pre-hydrated bentonite, lime, and caustic soda down to 437 m and with Drispac/lime mud from 437 m to 2580 m. From 2580 m the lime was phased out and the remaining well to TD was drilled with a lignite/lignosulphonate gel mud. During abandonment an anchor chain broke in severe weather. Th
Around this wellbore
This wellbore on Sodir FactPages →
About this data
Norwegian Offshore Directorate (Sodir) FactPages, mirrored nightly and used under the Norwegian Licence for Open Government Data (NLOD). Depths are metres along the wellbore from the kelly bushing unless a row gives its own unit; older cores are filed in feet. A zero the Directorate files for an unmeasured pressure, density, or temperature is shown as a dash.
Developers: this page as JSON is GET /v1/data/norway/wells/247, documented in the API reference.